Define Recommendations for PTFE?

(a) It can be either of the two forms given below:

(i) Dimpled large sheet

It may be circular or rectangular divided maximum into four parts. For dimpled sheets with smallest dimension exceeding 100 mm (dia. or smaller side of rectangle), the contact area shall be taken as gross area without deduction for the area of the dimples.

(ii) Arrayed (without dimples)

Distance between individual modules shall not be greater than 10 mm. Thickness of PTFE and its protrusion from recess depends upon maximum plan dimension as given in Table.

 

2252_Recommendations for PTFE.png


Related Discussions:- Define recommendations for ptfe

Parallel pipe systems or multipath pipeline problems, Parallel Pipe Systems...

Parallel Pipe Systems or Multipath Pipeline Problems Two or more sections of piping (branches) of different diameters, lengths and/or pipe materials originating and terminating

Permanent repairs to rail fracture, Q. Permanent Repairs to rail fracture? ...

Q. Permanent Repairs to rail fracture? (i) If the fracture is such that, wide gap A T welding ban be adopted, then the total length of fractured ends to-be cut shall be equal t

Precast pile, when a precast pile is single point lifting and when double p...

when a precast pile is single point lifting and when double point lifting- what are the moment coefficient of them?

How to calculate the diameter of the footing, A circular footing rests on a...

A circular footing rests on a pure clay with qu = 270 kN/m 2 , at a depth of 1.8 m. Verify the diameter of the footing if it has to transmit a load of 720 kN. Suppose the bulk u

Deflectin of beam, simply supported beam with point load at the centre

simply supported beam with point load at the centre

Determine the equivalent of free float, The free float is equal to: a. L...

The free float is equal to: a. Latest allowable event occurrence time + Early finish time b. Earliest event occurrence time + early finish time c. Latest allowable event o

Determine the project duration and critical path, Critical Path - Activity ...

Critical Path - Activity on Node The project precedence table shown below provides the relationships and durations of all activities. Based on end-of-day calculations for start

Segmentally lined and sprayed concrete linings tunnels, Q. Segmentally line...

Q. Segmentally lined and Sprayed Concrete Linings tunnels? The fundamental difference between segmentally lined tunnels and SCL tunnels is that the sprayed concrete in SCL tunn

CAD IN CIVIL ENGINEERING DRAWING LAB, EXPLAIN THE PROCEDURE FOR PREPARATIO...

EXPLAIN THE PROCEDURE FOR PREPARATION OF DRAWING USING AUTOCAD FOR RAPID SAND FILTER

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd