Define Project Scheduling - Types of Methods

Project Scheduling - Distinction between the Major Types of Schedule Diagrams

  • Precedence Diagrams (PDM)

 

a) Activity on Node (AON)

b) Can have any kind of precedence

  • Arrow Diagrams (AOA)

 

a) Activity On Arrow (AOA)

b) Activity-on-Branch

c) May have dummy tasks

d) Finish to start precedence only


Related Discussions:- Define project scheduling - types of methods

Calculate the surface dimensions of sedimentation tank, Calculate the surfa...

Calculate the surface dimensions of Sedimentation Tank A treatment plant upgrade calls for design of sedimentation basins to handle a flow rate of 8 MGD. The basins are for a T

Explain mild and high-yield steel, High-yield steel vs. mild steel as road ...

High-yield steel vs. mild steel as road reinforcement High yield steel is the preferred material for the reinforcement of concrete carriageway due to the subsequent reasons:

Designing of corbel beams in a pump station, Question In designing of ...

Question In designing of corbel beams in a pump station , why are shear links designed in top 2/3 of section? What is general advice on designing? Answer Corbel

School building, from surveying to school building finish

from surveying to school building finish

Physics, A point charge q2 = -2.3 µC is fixed at the origin of a co-ordinat...

A point charge q2 = -2.3 µC is fixed at the origin of a co-ordinate system as shown. Another point charge q1 = 4.0 µC is is initially located at point P, a distance d1 = 6.0 cm fro

Operation researcg, Discuss Scope and necessity of O.R in industry ?

Discuss Scope and necessity of O.R in industry ?

What is over vibration of fresh concrete, Q. What is Over vibration of fres...

Q. What is Over vibration of fresh concrete? For proper compaction of concrete by immersion vibrators, vibrating part of the vibrators must be completely inserted into the conc

Calculate the number of paths and critical paths, Calculate the Number of P...

Calculate the Number of Paths, Number of Critical Paths and Project Duration For the project network shown, the total number of paths through the network; number of critical pa

Estimate the probable final settlement, A bed of sand 12 m thick is underla...

A bed of sand 12 m thick is underlain by a compressible stratum of normally loaded clay, 6 m thick. The water table is at a depth of 5 m below the ground level. The bulk densities

Strength of materials, Didtribution of shear stree over a triangular sectio...

Didtribution of shear stree over a triangular section

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd