Data and tasks - rough-cut capacity planning, Mechanical Engineering

Assignment Help:

Expected quarterly sales in Year 1 (vehicles)

The work content of a single unit of each product in each process has been estimated at:

Using MS-Excel, calculate the workloads on each workcentre, expressed in actual quarterly, total annual and average quarterly terms.

Using a stacked vertical barchart in MS-Excel, display the total workload on the workshop for each quarter, broken down further to each workcentre.

The ideal quarterly capacity of a single unit of each resource in each workcentre, assuming full efficiency is:

In other installations, the actual, historically observed efficiency of these resources has been:

Taking into account the probable efficiencies of the resources, calculate and display in a table the effective quarterly capacity of a single unit of each resource.

Based on your answer to Task 3, calculate the "ideal" number of units of resource each quarter (i.e. the number of units of resources in each workcentre that would just meet the workload).

What would be a practical number of units of resource in each workcentre that would allow capacity to go all through the year unchanged? (Assume that demand timing is flexible [i.e. demand can be levelled between quarters] and that capacity can be rounded up to the average quarterly level.)

What would be the resulting quarterly and annual utilisations in each workcentre?


Related Discussions:- Data and tasks - rough-cut capacity planning

Cover left crank case and check shifter drum, Open cover left crank case an...

Open cover left crank case and check shifter drum bolt and washer: Check shifter drum bolt torque and washer direction and avail ability.

Press tools, Difference between press forminig and hammer forming

Difference between press forminig and hammer forming

Construction activities for plant, Construction Activities for plant Co...

Construction Activities for plant Construction activities, such as shoring and bracing of excavations, lifting and rigging activities and scaffolding need to be considered as p

Thermodynamics, show that energy is property of system

show that energy is property of system

Define the process of otto cycle, Define the process of Otto cycle The...

Define the process of Otto cycle The Otto cycle is the ideal air standard cycle for petrol and gas engine. It having of four processes. Process 1 to 2 is isentropic comp

Plate clutch for warpage-clutch jerking, Plate clutch for warpage : Place ...

Plate clutch for warpage : Place plate clutch on surface plate and check for warpage. Ensure that 0.20 mm feeler gauge does not slide freely.

List out the types of fixtures, List out the Types of fixtures? Mil...

List out the Types of fixtures? Milling fixtures Lathe fixtures. Grinding fixtures Broaching fixtures Assembly fixtures Inspection fixtures Boring f

What are methods used in rating for time study, a)What are methods used in ...

a)What are methods used in rating for time study. Illustrate them. b) Write down principles of motion economy.

Exhaust manifold-basic components of engine , Exhaust Manifold : The pipe ...

Exhaust Manifold : The pipe which connects the exhaust system to the exhaust valve of the engine through which the products of combustion escape into the atmosphere is called the

Shut-off valves on major zone, Q. Shut-off valves on major zone? Are shu...

Q. Shut-off valves on major zone? Are shut-off valves on major zone branches and on the bottom and top of riser? Are balancing valves on return branches? Are control valves on

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd