Data and tasks - rough-cut capacity planning, Mechanical Engineering

Assignment Help:

Expected quarterly sales in Year 1 (vehicles)

The work content of a single unit of each product in each process has been estimated at:

Using MS-Excel, calculate the workloads on each workcentre, expressed in actual quarterly, total annual and average quarterly terms.

Using a stacked vertical barchart in MS-Excel, display the total workload on the workshop for each quarter, broken down further to each workcentre.

The ideal quarterly capacity of a single unit of each resource in each workcentre, assuming full efficiency is:

In other installations, the actual, historically observed efficiency of these resources has been:

Taking into account the probable efficiencies of the resources, calculate and display in a table the effective quarterly capacity of a single unit of each resource.

Based on your answer to Task 3, calculate the "ideal" number of units of resource each quarter (i.e. the number of units of resources in each workcentre that would just meet the workload).

What would be a practical number of units of resource in each workcentre that would allow capacity to go all through the year unchanged? (Assume that demand timing is flexible [i.e. demand can be levelled between quarters] and that capacity can be rounded up to the average quarterly level.)

What would be the resulting quarterly and annual utilisations in each workcentre?


Related Discussions:- Data and tasks - rough-cut capacity planning

Airport layout - planning a new airport, Airport Layout: The main com...

Airport Layout: The main components of an airport are: (a)        Runways (b)       Taxiways (c)        Apron (d)       Terminal area (i)        Terminal build

Determine weight of body and coefficient of the friction, Determine weight ...

Determine weight of body and coefficient of the friction: For ce of 200N is needed just to move a certain body up an inclined plane of angle 15°, the force is parallel to th

Estimate what fraction of heat loss by the fin, A tube assembly constructed...

A tube assembly constructed of Cu with an inside diameter of 1.25 cm, wall thickness of 0.8 mm and circumferential fins around the periphery. The fins have thickness of 3 mm, and a

Flow work and flow energy - thermodynamics, Flow Work and Flow Energy - the...

Flow Work and Flow Energy - thermodynamics: Flo w Work:  The flow work is energy needed to move the working substance against its pressure It is called as flow or displac

What is hybrid sweep, Hybrid Sweep It combines linear and/or non-linear...

Hybrid Sweep It combines linear and/or non-linear sweep via set operations. In this case, two point sets are swept in two different directions and the two resulting swept volum

Velocity and shear stress distribution, Draw a graph of velocity and shear ...

Draw a graph of velocity and shear stress distribution profile for viscous flow between two parallel plates.

Find minimum time for a vehicle to go from 0 to 60 mph, For a few of the fo...

For a few of the following problems the constant acceleration is due to gravity and will be notated as a = g = 32 ft/sec 2 . 'g' perhaps positive or negative depending on the conte

Determine the cutting ratio, Write the velocity relationship in orthogonal ...

Write the velocity relationship in orthogonal cutting. A bar of 75 mm dia. is reduced to 73 mm by a cutting tool while cutting orthogonally. If the mean length of cut chip is 73.5

How can you implement permeability test, Q. How can you implement Permeabil...

Q. How can you implement Permeability test  As already defined, permeability of porosity of the moulding sand is the message of its ability to permit air to flow through it.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd