Cutting test, Mechanical Engineering

Assignment Help:

Cutting Test:

            Once the sand blasted blade were went through the washing process. Quality Control technician will randomly pick 15 pieces of blade to go for cutting test. Blade had a specific requirement for cutting force and cutting angle. The required cutting angle is 30 degree. Average of blade cutting force may not exceed the cutting for of 1.3N. If there is a exceed 1.3N, quality control must reject the order batch.   Maximum force of a single blade cannot be exceeding 1.4N. If there is one found higher than 1.4N, quality control had to make test on another 20 pieces. If there is a exceed 1.4N, quality control must reject the order batch.


Related Discussions:- Cutting test

Concept of centrifugal tension, Concept of centrifugal tension: Expl...

Concept of centrifugal tension: Explain concept of centrifugal tension in any belt drive. What is main consideration for taking maximum tension? Sol: T he belt continuo

Evaluate the principal stresses and principal planes, At a fixed point in a...

At a fixed point in a strained material the intensities of normal stress on the planes at right angles to each other are 20 N/mm 2 and 10 N/mm 2 . Evaluate the principal stresses

.high lead copper alloy castings, I have faced a serious problem of Lead se...

I have faced a serious problem of Lead segregation and porosity in Copper Tin Zn alloy containing 26-30 % lead sand castings.Can anybody throw light on this

Controls for resistance welding machines, Controls for resistance welding m...

Controls for resistance welding machines The main controls required for a resistance welding machine are: i. Initiation and termination of the current. ii. Controlling the mag

Computer integrated manufacturing, the component of computer integrated man...

the component of computer integrated manufacturing with the diagram

Shear forces and bending moments, Shear Forces and Bending Moments: ...

Shear Forces and Bending Moments: A beam is a structural member, subjected to a system of external forces (involving inclined load) to generate the bending of the member in

Beam, Beam: What do you mean by Beam, and Shear force and bending mom...

Beam: What do you mean by Beam, and Shear force and bending moment diagrams? Sol.: A beam is structural member whose longitudinal dimensions (that is width) is large co

Describe cool storage and coal preparation technique, Illustrate in brief t...

Illustrate in brief the types of power plant? Illustrate the factor to be considered for site selection in hydro power plant? a) Compare stream power plant with hydro power p

marginal rate of technical substitution?, Assume the production function f...

Assume the production function for a rm is given by the equation Q = L √K. Graph the isoquants corresponding to Q = 10, Q = 20, and Q = 50. Do these isoquants exhibit diminishing

Resource management for project, Q. Resource Management for project? An...

Q. Resource Management for project? An important factor in overall project success is the provision of suitable and adequate resources. The initial estimate of engineering man

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd