Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
The FESTO conveyer consists of 600mm belt driven by a 24V d.c. motor at a rate of 13 seconds per metre. A relay on the FESTO panel controls the motor operation and is wired for source operation.
A block on the conveyer can be directed down one of three shoots by an air operated ram. If no gates are operated the block will move to the end and down the last shoot.
In fig 2 the block enters the conveyer at the top of the picture and is detected by the EntryPE. Located next is the GateOnePE, if GateOne is closed, the block will be directed down the first shoot.
The position of GateOne arm is detected by GateOneArmPE.
The process is repeated for each of the other two gates. The fourth shoot directs the block down the shoot, the presence of a block can be detected by GateFourPE
What is the maximum memory size that can be addressed by 8086? In 8086, an memory location is addressed by 20 bit address and the address bus is 20 bit address and the address
Electromechanical Meters Electromechanical energy meters are based on the Ferraris Principle (see note in the margin). The working of these meters is explained. Working o
Q. What is Own-exchange routing? Distributed routing or own-exchange routing enables alternative routes to be chosen at intermediate nodes. Hence the strategy is capable of res
Q. Effect of feedback on dynamic response and bandwidth? Let us consider the block-diagram representation of the open-loop system shown in Figure 16.2.5(a), whose direct transf
\ Transistor voltmeter (TVM) : a simple diagram of TVM using two transistors in the bridge configuration is as shown. TVM is provided by using transistor bridge circuits. In b
Q. explain the architecture of SS7 and compare with seven-layer OSI architecture. Ans: A block schematic diagram of CCITT no. 7 signalling system is displayed in figure. Sig
Illustrates about the power dissipation management in embedded system? Power Dissipation Management a. Clever real-time programming through Wait and Stop instructions b.
When you have a three phase short circuit of power cables laid in a trefoil formation they repel apart very dramatically. Why is this and what is happening?
units of potential energy
Show that the infiltration volume estimated using Horton's infiltration equation between times t1 and t2 is given by; F =f c (t 2 -t 1 )+(f 1 -f c )(1-e -k(t2-t1) )/k Use the
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd