Construction of boiler, Mechanical Engineering

Assignment Help:

CONSTRUCTION FEATURES:

Comprises of a water drum which is connected to two headers at the front and back ends. The headers are connected by large number of water tubes which is inclined upwards from down take header to uptake header. Furthermore, a mud drum, in which heavier sediments of water settle down and are blown off from the blow off pipe, is provided. The combustion chamber is located below the boiler drum. A chain grate with the stoker is provided from burning coal. Hot flue gasses which are produced after combustion of fuel are made to pass over the water tubes in several passes with the help of baffles. The draught is regulated using dampers provided. Lastly, chimney is provided to permit exit of waste flue gasses.

A super heater is provided to superheat dry and saturated steam. It comprises of U tubes and is placed in path of flue gasses.

A number of mountings which ensure safe and efficient operation of boiler are also provided. These include water level indicator, Dead weight safety valve, Pressure Gauge etc.

 

 


Related Discussions:- Construction of boiler

Vicker''s hardness test, V icke r ' s Hardness Test: This test is ...

V icke r ' s Hardness Test: This test is alike the Brinell test but uses different indenter. A square based pyramid of cone angle 136 ° is used. The applied load can be 5,

Show mass energy relation, Q. Show Mass energy Relation? Until the time...

Q. Show Mass energy Relation? Until the time of Einstein, mass and energy were considered as two different physical quantities. But in 1905, with the help of postulates of the

Manufacturing methods of ceramics, Manufacturing Methods Of Ceramics Th...

Manufacturing Methods Of Ceramics The ceramics manufacturing consists in shaping along with or without pressure and firing to consolidate. The simplest and cheapest process of

Steam , how to calculate the volume of HFO burn to produice steam?

how to calculate the volume of HFO burn to produice steam?

Inspection of flange assembly, Q. Inspection of Flange assembly? Flange...

Q. Inspection of Flange assembly? Flanges shall be clean and free of old gasket fragments, scratches, burrs, pits, etc. if needed, the flange surfaces shall be cleaned with a s

Laminar flow, Consider fully developed laminar flow with constant propertie...

Consider fully developed laminar flow with constant properties in a circular tube. Let there be heat transfered  to or from  the fluid at a constant rate per unit of tube length.Ad

Determine the slopes at free end - cantilever beam, Determine the slopes at...

Determine the slopes at free end - cantilever beam: A cantilever beam of length l carries a point load W at a distance l  /4 from free end. Determine the slopes at free end

Discover the torque on the shaft, Discover the torque on the shaft: A ...

Discover the torque on the shaft: A steel shaft transmits 105 kW at 160 rpm. If the shaft is 100 mm diameter, discover the torque on the shaft and the maximum shear stress ind

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd