A Beam A B 12 meter long rests on supports 9 meter apart the right hand end over hanging the supports by 1 m and the left hand end by 2 m . The beam carries a uniformity distributed load of 300 kg per meter. The beam also carries a point load of 2000 kg at extreme right hand end and apart of 1500 kg at the left hand end.
Construct the shear force and bending moment diagrams and also calculate the maximum bending moment.
Q. Kerb overflow weirs – horizontal bars vs. vertical bars? Overflow weirs must be provided for steep roads (longitudinal gradient>5%), flat roads (longitudinal gradient Ess
how to use an autocad
Pre-tensioned concrete elements It is the act of transferring the stress in prestressing tendons to the concrete member. In the case of pre-tensioned concrete elements, this st
For a system Q =W+ ΔE where ΔE is the change in E, the stored energy in the ΔE system. E has various forms 1. Kinetic Energy 2. Potential Energy Work do
Reasons of ground heaving during pipe-jacking It is commonly recognized that ground settlement is one of the significant concern in pipe jacking operation. Though engineer mus
Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was
any type of civil live project at hyderabad
Question In case if there is a delay of bituminous laying on top of sub-base, have to tack coat be applied on the top surface of sub-base? Answer When there is a d
Differentiate between concrete and tendons In the case of pre-tensioned concrete members, the transfer of prestress takes place due to the bond between concrete and tendons. In
Enumerate about the Bonded Member It is a concrete member in which tendons are bonded to the concrete. They may be directly bonded to the concrete as in the case of pre-tension
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd