Checking at site - testing of meter, Electrical Engineering

Assignment Help:

Checking at Site - Testing of Meter

The routine testing of meters should be carried out once in 3 years. Further, surprise checks should be conducted at the consumer's installation and meters should be checked from time to time. The significant points to be paid attention to although checking are given below.

Checklist of Important Points for Checking at Site

i) Connections of meter are proper.

ii) Seals are not tampered with.

iii) No loose or direct connections exist.

iv) Meter is not damaged to record less.

v) CTs are properly linked.  No reversal of any phase connection exists. There are multiplying factor is properly calculated and applied.

vi) Meter is well protected from rain, vermin's and dust etc.

vii) Links are connected.

viii) Terminal block is not damaged.

Along with the help of load current of known magnitude (preferably of resistive type) and a wrist watch having a second's hand, you could off hand check at site the performance of the meter as also its accuracy to a few extent.


Related Discussions:- Checking at site - testing of meter

Equivalent circuit of unijunction transistor, Equivalent Circuit : Th...

Equivalent Circuit : The equivalent circuit of a UJT is shown in fig. The P - N junction represented in the emitter by a diode. Silicon bar being lightly doped has a high res

Digital logic circuits, . In successive-approximation A/D converter, offset...

. In successive-approximation A/D converter, offset voltage equal to 1/2LSB is added to theD/A converter’s output. This is done to

Determine the armature current and torque angle, Q. Determine the armature ...

Q. Determine the armature current and torque angle? A 1500-hp, 6600-V, six-pole, 60-Hz, three-phase, wye-connected, synchronous motor, with a synchronous reactance of 36 , neg

.energy, units of potential energy

units of potential energy

Resonance, i want to plot a system current transfer matrix element vs frequ...

i want to plot a system current transfer matrix element vs frequency curve.how can i draw it?any suggestion.

What layers are covered under end to end layer connectivity, Q. What layers...

Q. What layers are covered under end to end layer connectivity? Layers 4-7 of ISO-OSI reference model communicate with peer entities in end systems. In intermediate systems,th

Determine the disadvantages of GPS system, Determine the disadvantages of G...

Determine the disadvantages of GPS system -  Maps not up to date hence instructed to carry out an incorrect manoeuvre (for example turn into a road that no longer exists) -

Pop instruction, POP Instruction This instruction  copies the contents ...

POP Instruction This instruction  copies the contents  of the top  two locations  of the  stack into the  specified  register pair. The  contents  of stack pointer register are

Sequential diagram, 1) Draw the state diagram for the state machine describ...

1) Draw the state diagram for the state machine described by Table 7.5 in the text. Note, the table shows the transition to the next state S* from the current state S for the next

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd