Causes of poor lighting, Operation Management

Assignment Help:

1. Flickering tubes: This condition which may be due to defective conditions or by tube which has reached its working life, creates eyestrain.

2. A. Misadjusted Reflector : A source of glare.

B .Installation with line of Vision : In absence of proper control of brightness intensity cause eyestrain and glare. Un shaded light source particularly when within the line of vision creates glare . in many of the industrial plants filament lamps are not equipped with proper reflectors.

3. Lack of uniformity: Variation in intensity of light may result in accident as eye sight is unable to accommodate quickly enough the change.

4. Showdowns or spotty illumination : Such condition is not suitable to production or safety due to relative brightness and surface reflection involved.

5. Inadequate Amount of light : Low level lighting may become source of accident due to eye strain and fatigue.


Related Discussions:- Causes of poor lighting

Describe customer-contact matrix perspective, Describe a company of your ch...

Describe a company of your choice from the customer-contact matrix perspective. Discuss the operations of the organization from your perspective using the three elements of the cus

Show the importance of e-commerce in product design, Question 1: (a) Op...

Question 1: (a) Operations management is an integral part of an organisation. Show how operations management can contribute to the success of an organisation. (b) Differen

Describe modern healthcare systems, Discuss the Chaos Theory (Be sure to re...

Discuss the Chaos Theory (Be sure to read the lectures concerning this theory, as well as go through the additional links) in relation to the health care system today. In addition,

Automated layout design programme, Automated Layout Design Programme or ALD...

Automated Layout Design Programme or ALDEP Here the closeness relationship between two department is used to build up layout . Computer selects randomly the first facility and

Explain two different forecasting techniques, Two different forecasting tec...

Two different forecasting techniques (F1 and F2) were used to forecast demand for cases of bottled water. Actual demand and the two sets of forecasts are as follows: PREDICTED DEMA

Explain what is the productivity measure, A hamburger factory produces 40,0...

A hamburger factory produces 40,000 hamburgers each week. The equipment used costs $5,000 and will remain productive for 4 years. The labor cost per year is $9,500. a. What is t

Compute the line efficiency of longest processing time, Balance the assembl...

Balance the assembly line in Exhibit 8.12 for (a) a shift output of 60 pieces and (b) a shift output of 40 pieces. Assume an eight-hour shift, and use the rule, choose the assignab

Draw a diagram of the factory and finding the maximum rate, Factory is a ba...

Factory is a bathtub with 50 gallons capacity, drain is outlet to market and can output 3 gallons per hour. Faucet is raw material input and allows materials in at a rate of 4 gall

Explain graph based layout construction method, Is the Graph based layout c...

Is the Graph based layout construction method always produces maximally Planar Graph & Maximally Planar weighted graph?

Describe the differences between utilization and efficiency, Discuss the di...

Discuss the differences between utilization and efficiency as measures of system performance. Which (if any) is the most useful measure for an operations manager? Why?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd