case study, Other Engineering

Assignment Help:
M/s XYZ Ltd manufactures a product “PLVS” at its plant at Meerut, the maximum capacity of which is 200 units per month. Details of raw materials which go into the making of 1 units of “PLVS” are provided to you below:-
Sl.No Raw material description Standard Qty per finished unit (No) Standard purchase price per unit (Rs. 00)
1 A 1 6
2. B 2 5
3. C 3 4
4. D 4 3
5. E 5 2
6. F 6 1

Standard fixed overheads are Rs. 20,00,000/- per month whereas the standard variable overhead rate has been estimated as equal to Rs.1,400/- per unit of finished good.

You are required to compute the
a) Standard cost of the product.
b) Compute the production volume variance in case the company produces and sells only 100 units of finished goods in the concerned month.
c) Compute the usage and material price variances considering the following actual data (actual production and sale: 100 units)

Related Discussions:- case study

Difference amplifier, Difference amplifier: Figure shows how two inputs...

Difference amplifier: Figure shows how two inputs can be subtracted. This circuit differs from previous types with negative feedback in that the non-inverting terminal is not

Full-authority digital electronic control, Full-authority digital electroni...

Full-authority digital electronic control: The supervisory control was a step toward the full-authority, fully redundant EEC. It controls all engine functions and eliminates th

Water, Dear Sir, Please answer the follwing question . Specs: Filterati...

Dear Sir, Please answer the follwing question . Specs: Filteration Capacity 18000 LPH , Tested pressure 6Kg/Sq.cm, Vertical MS pressure Sand filter(flat ends 6mm thick & di

Traffic management, (a) Discuss the requirements, specifications and specia...

(a) Discuss the requirements, specifications and special requirements for the  design of arterial road networks and residential area street networks in a developing suburban region

Math modelling, As an engineering student, the ministry of energy and miner...

As an engineering student, the ministry of energy and minerals has tasked you to help them model equation(s) that can estimate the amount of crude oil in a reservoir. The governmen

KK-3 system coding, how to write code for any particle shape using KK-3 sys...

how to write code for any particle shape using KK-3 system coding in grope technology

Microbiology, Explain the following observations: cells of Escherichia coli...

Explain the following observations: cells of Escherichia coli fermenting glucose grow faster when NO3 - is supplied to the culture and then grow even faster when the culture is hig

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd