Calculate the voltage regulation, Electrical Engineering

Assignment Help:

The per-phase synchronous reactance of a three-phase, wye-connected, 2.5-MVA, 6.6-kV, 60-Hz turboalternator is 10 . Neglect the armature resistance and saturation. Calculate the voltage regulation when the generator is operating at full load with (a) 0.8 power factor lagging, and (b) 0.8 power factor leading.


Related Discussions:- Calculate the voltage regulation

Compute current in given the circuit configuration, Q. Consider the circuit...

Q. Consider the circuit configuration shown in Figure. Let V i = 1V, R 1 = 1000, R 2 = 2000, and A = 3. (a) Compute i 2 . (b) If R 1 changed to 500 , recompute i 2 .

Signal processing 1 ., region of convergence of (Z+2)*(12z-1)/((3z-1)*(4z+1...

region of convergence of (Z+2)*(12z-1)/((3z-1)*(4z+1 ))

Discuss mode - 2 of programmable peripheral interface, Discuss mode -2 (bi-...

Discuss mode -2 (bi-directional mode) of 8255 (Programmable Peripheral Interface). Only permitted with port A. Bi-directional bus data used for interfacing two computers and GP

Explain n - type semiconductor, Explain n - Type semiconductor. n - ...

Explain n - Type semiconductor. n - Type semiconductor:- (i) If small amount of pentavalent impurity is added with, to a pure semiconductor giving a large number of free

Electronics, why bypass capacitor is used

why bypass capacitor is used

Design of a p only controller, For an operating point half way up the paral...

For an operating point half way up the parallel section and the discharge valve and the discharge fully open, design a proportional only controller which will give closed loop dyna

Explain the parallel in - parallel out shift registers, Explain the Paralle...

Explain the Parallel In - Parallel Out Shift Registers? For "parallel in - parallel out" shift registers all data bits show on the parallel outputs immediately following the si

Planned and coordinated development - rural electrification, Planned and co...

Planned and coordinated development: The CEA would prepare the global Electricity Plan after carefully carrying out the demand forecast in consultation along with stakeholders

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd