Calculate efficiency to load at unity power factor, Electrical Engineering

Assignment Help:

Q. A 300-kVA transformer has a core loss of 1.5 kW and a full-load copper loss of 4.5 kW.

(a) Calculate its efficiency corresponding to 25, 50, 75, 100, and 125% loads at unity power factor.

(b) Repeat the efficiency calculations for the 25% load at power factors of 0.8 and 0.6.


Related Discussions:- Calculate efficiency to load at unity power factor

Multiplexer, design a 32:1 multiplexer using two 16:1 multiplexer

design a 32:1 multiplexer using two 16:1 multiplexer

Design 100 two-motion selectors, Design : Rather than 100 two-motion selec...

Design : Rather than 100 two-motion selectors as in the case of Design 3, let's consider only 24 two-motion selectors. In the case 24 simultaneous calls can be put through the swi

Explain working of inverting summing amplifier, Q. Explain working of Inver...

Q. Explain working of Inverting Summing Amplifier? The circuit of Figure is extended by adding other input points, as shown in Figure. Because of the virtual ground at terminal

Find the output voltage in full-wave rectified waveform, Q. The full-wave r...

Q. The full-wave rectified waveform, approximated by the first three terms of its Fourier series, is given by v (ωt) = V m sin (ωt/2), for 0 ≤ ωt ≤ 2π, and where V m = 100

#emf., what is the effect of back emf ?

what is the effect of back emf ?

Explain ferrites and its uses in high frequency devices, Explain ferrites a...

Explain ferrites and its uses in high frequency devices. A group of magnetic alloys show the property of magnetisation that change, with percentage of various constituent atoms

Find the voltage at the load terminal, Q. Two three-phase generators are su...

Q. Two three-phase generators are supplying to a common balanced three-phase load of 30 kW at 0.8 power factor lagging. The per-phase impedance of the lines connecting the generato

Create a time diagram - conveyer, When the PLC is in the RUN mode it will s...

When the PLC is in the RUN mode it will switch ON the conveyer so it will run continuously. This project is divided into four outcomes: (a)    Detect block on entry, close

Estimate the missing precipitation to long-term average, Out of a long-term...

Out of a long-term record of precipitation for four adjacent stations you find that records of one station (station D) are missing for the spring months, September, October, and No

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd