A capital improvement project requires the installation of a property line fence along the 250-ft Northern boundary line.The decorative aluminum fence is constructed of posts spaced at 10-ft centers and an ornate picket infill panel. The material costs for this scope of work is most nearly:
Solution: Develop a Bill of Materials and multiply quantities by the costs:
Aluminum Posts: 26 x $645.35 = $16,779.10
Picket Infill Panel 25 x $1,985.50 = $49,637.50
Grand Total $66,416.60
what is reciprocal ranging?
interplanar spacing
Explain me about obstacles in chain surveying and what is meant by cross staff,offsets?
Question How does an engineer determine digit of cells for concrete box girder bridges ? Answer If depth of a box girder bridge exceeds 1/6 or 1/5 of bridge width, then it is o
What are main and key benefits of piers constructed monolithically with bridge deck over usage of bearings?
I am M tech in civil engg looking for online assignment job.
Equivalent static load method After the earthquake in Messina-Reggio Italy 1908, a team composed of engineers were sent on duty to study deteriorated buildings and investigate
Gts bench mark in thane district maharashtra
Explain the Coordinate System 1. A Benchmark provides only elevation data. 2. Coordinate System provides northing and easting coordinates within a defined system. 3. Coor
What is the difference between accuracy and precision.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd