A capital improvement project requires the installation of a property line fence along the 250-ft Northern boundary line.The decorative aluminum fence is constructed of posts spaced at 10-ft centers and an ornate picket infill panel. The material costs for this scope of work is most nearly:

Solution:  Develop a Bill of Materials and multiply quantities by the costs:

Aluminum Posts:  26 x $645.35 = $16,779.10

Picket Infill Panel 25 x $1,985.50 = $49,637.50

    Grand Total   $66,416.60


Related Discussions:- Calcculate the material costs

Laplace transform, Using Laplace transfom, the following differential equat...

Using Laplace transfom, the following differential equation d y dy dt reduces to the algebraic equation of the form Resolve y(s) into partial fractions

Formation of frost heave, Q. Formation of frost heave? In the past, it ...

Q. Formation of frost heave? In the past, it was believed that formation of frost heave was related to volumetric expansion of soil water which changed from liquid state to sol

Show the application of concrete crash barriers, Q. Show the application of...

Q. Show the application of Concrete crash barriers? Concrete crash barriers aren't considered as the best barrier design due to the following reasons when compared with flexibl

Demonstrate the economical design of concrete, Demonstrate the economical d...

Demonstrate the economical design of concrete A safe, serviceable and economical design of concrete structures requires a comprehensive knowledge of the loads expected to be a

Determine the total head and total pressure of water, Determine the total h...

Determine the total head and total pressure of water flowing at  in a pipe which has the following data: Flow= 2,500 gpm; Elevation = 30 ft; Pressure = 40 psi; Pipe Diameter =

Temporary repairs to rail fracture, Q. Temporary Repairs to rail fracture? ...

Q. Temporary Repairs to rail fracture? If a welding party is not readily available, the fracture shall be repaired by using a cut-rail (not less than 4 meter long) and clamped/

Define the term- erection stresses, Define the term- erection stresses ...

Define the term- erection stresses The creep loss due to live load stress, erection stresses and other stresses of short duration may be ignored. The loss of prestress due to

Explain the steady and uniform flow, Explain the Steady and Uniform Flow ...

Explain the Steady and Uniform Flow Steady flow: Flow quantity does not change over time. Uniform flow: The slopes of the energy grade line S = dE/dL, the hydraulic grade li

Explain total dynamic head (tdh), Total Dynamic Head: (TDH) y-axis plo...

Total Dynamic Head: (TDH) y-axis plot point related to each x-axis flow rate along the system curve plot. TDH = h a = TSH + h f + v 2 /2g       v 2 / 2g usually small

What is the meaning of compressive stresses, What is the meaning of compres...

What is the meaning of compressive stresses These intentionally induced stresses are compressive in nature and these compressive stresses reduce or completely remove the undesi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd