Calcculate the material costs, Civil Engineering

Assignment Help:

A capital improvement project requires the installation of a property line fence along the 250-ft Northern boundary line.The decorative aluminum fence is constructed of posts spaced at 10-ft centers and an ornate picket infill panel. The material costs for this scope of work is most nearly:

Solution:  Develop a Bill of Materials and multiply quantities by the costs:

Aluminum Posts:  26 x $645.35 = $16,779.10

Picket Infill Panel 25 x $1,985.50 = $49,637.50

    Grand Total   $66,416.60


Related Discussions:- Calcculate the material costs

Window, sliding window lowered window sash or glazed window circular window...

sliding window lowered window sash or glazed window circular window

Soil testing, what is black cotton soil in dry condition

what is black cotton soil in dry condition

Define npdes sampling requirements, Define NPDES Sampling Requirements? ...

Define NPDES Sampling Requirements? The sampling needs under NPDES are given at 40 CFR Part 122, as part of the needs for applying for an NPDES discharge allow. The needs are b

Define the limitations of shock transmission unit, Define the Limitations o...

Define the Limitations of shock transmission unit? STUs are not intended for energy/shock absorption. They simply transmit load from one part of the structure to another thus s

Define resultant force on a given area of a horizontal plane, Resultant For...

Resultant Force on a Given Area of a Horizontal Plane By equation, the total vertical force applied to an area A on the plane is: Resultant Force R = ΡA = (lb/ft 2 )(ft 2 )

What is a feasibility study, In order to make wise investments in a marketp...

In order to make wise investments in a marketplace experiencing enhancing levels of risk, companies are turning to feasibility studies to verify if they should offer new products,

# bnm.l/j, what does oxymoron mean

what does oxymoron mean

Lagrange''s mean value theorem, Write some appplications of lagrange''s mea...

Write some appplications of lagrange''s mean value thorem

Calculate the total passive earth resistance on the wall, A  retaining wall...

A  retaining wall, 4.5 m high, retains a soil with  c = 2 N/cm 2 ,  φ = 30° and g = 20 kN/m 3 , with horizontal surface level with the top of the wall. The backfill carries a surch

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd