Bund / dike capacity is typically covered by local codes and regulations, however some general principles for liquid storage compounds are:

• The net capacity of a bunded / diked compound in a storage facility must be at least 120% of the net capacity of the largest tank. Take into consideration the capacity displaced by other tanks within the same bunded / diked area and any foundations. Treat interconnected tanks as a single tank of equivalent total volume.

• For flammable liquids, bund / dike capacity should be at least 133% of the net capacity of the largest tank. If an automatic fire sprinkler system is installed in or over any bunded / diked tank or drum storage compound, the capacity of the bund / dike should be increased either by a volume equal to the output from the sprinkler system for a period of at least 20 minutes, or to 133% of the capacity of the largest tank, whichever is greater.


Related Discussions:- Bund and dike capacity

Access considerations for plant design, Q. Access Considerations for plant ...

Q. Access Considerations for plant design? Plant facilities shall be provided with acceptable access and egress for personnel, materials, and equipment by using access ways, ro

What do you understand by straight line mechanism, What do you understand b...

What do you understand by straight line mechanism ? Describe with a neat sketch the working and construction of any three types of straight line mechanism. Derive a mathematical

Explain the principle of screw conveyer, Explain the Principle of screw con...

Explain the Principle of screw conveyer When materials are feed into the fixed chutes, due to action of gravity of materials and the friction force between material and chute t

Define the application of abrasive jet cutting machines, Define the Applica...

Define the Application of Abrasive Jet Cutting Machines Cleaning purpose. Cutting fine lines. Machining semiconductors. Drilling and cutting thin section of har

Mockup of tube to tubesheet, what are the tests to carried out after mockup...

what are the tests to carried out after mockup preparation

Ladder friction, Ladder friction: .: A ladder is an arrangement whic...

Ladder friction: .: A ladder is an arrangement which is used for climbing on the walls. It consists of two long uprights of wood or iron and connected by many cross bars. Th

Basic concept of repairing of motorcycle , Basic Concept: Proper care and ...

Basic Concept: Proper care and maintenance are essential for trouble free operation and optimum performance of the motorcycle. A quality repair ensures that excess wear and tear i

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd