Bund / dike capacity is typically covered by local codes and regulations, however some general principles for liquid storage compounds are:
• The net capacity of a bunded / diked compound in a storage facility must be at least 120% of the net capacity of the largest tank. Take into consideration the capacity displaced by other tanks within the same bunded / diked area and any foundations. Treat interconnected tanks as a single tank of equivalent total volume.
• For flammable liquids, bund / dike capacity should be at least 133% of the net capacity of the largest tank. If an automatic fire sprinkler system is installed in or over any bunded / diked tank or drum storage compound, the capacity of the bund / dike should be increased either by a volume equal to the output from the sprinkler system for a period of at least 20 minutes, or to 133% of the capacity of the largest tank, whichever is greater.
Determine the loading on the beam: Shear force diagram for a loaded beam is illustrated in Figure. Determine the loading on the beam & therefore, draw the bending moment diagr
how to solve engineering mechanics statics problem?
WORKSHOP DISCIPLINES Following discipline tips should be made a part of life to become a good technician. These will certainly help in creating safe, friendly and clean enviro
The open square tube is subjected to the torque T= DEF Nm as shown in Fig Q2. The tube has the length 1m and wall thickness 5mm. a) Calculate the shear stress and angle of
Q. What is meant by dynamically induced emf and statically induced emf? On what factors do these depend? Derive eq. for these two emfs. Sol. Dynamically induced emf:
Simple Rules FIFO (first in first out) PN j = t aj SPT (shortest processing time) PN j = o j ODD (earliest operation due dates) PN j = t dj EDD (earliest job due
BOILER CLASSIFICATION : (1 ) According to Tube Contents: Boilers can be water tube or fire tube type. In water tube boilers water flows in tubes and in Fire Tube Boilers h
maximum production rate
Parts of Motorcycle Figure: Right Side View of a Motorcycle 12 Part No. Name Functions 1 Muffler he
Q. What is Issued for Approval? This initial formal issue of the P&IDs to the Customer incorporates the process development agreed to in the approved IFD level PFDs. In additi
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd