Bund / dike capacity is typically covered by local codes and regulations, however some general principles for liquid storage compounds are:
• The net capacity of a bunded / diked compound in a storage facility must be at least 120% of the net capacity of the largest tank. Take into consideration the capacity displaced by other tanks within the same bunded / diked area and any foundations. Treat interconnected tanks as a single tank of equivalent total volume.
• For flammable liquids, bund / dike capacity should be at least 133% of the net capacity of the largest tank. If an automatic fire sprinkler system is installed in or over any bunded / diked tank or drum storage compound, the capacity of the bund / dike should be increased either by a volume equal to the output from the sprinkler system for a period of at least 20 minutes, or to 133% of the capacity of the largest tank, whichever is greater.
Determine root of equation xe x = cosx by Muller's method. Solve the following equations by Matrix Inversion method.
Q. Local operator panel for steam generator? A local operator's panel is required for operator use during Steam Generator light off. This panel shall contain the following equ
explain capacity planning system
what is adiabatic process ?
A temperature control process has a first-order response with a step response time of 12 seconds. In selecting a temperature sensor for the control system for the process, for what
I need a work to be done in the field of technical function generation for a product development process and about 3000-3500 words on any theoretical topic related to product devel
how to work proell govwrnor?
Explain Principle of Design of Jig and Fixture While designing jigs and fixtures following considerations should kept in mind: Reduction of idle time. Rigidity
AA steam power plant operates on a reheat Rankine cycle. Steam enters the high-pressure turbine at a pressure of 12.5 MPa and temperature of 550 oC at a rate of 15 kg/s. It leaves
Q.Show the procedure of spot welding ? The steps involved in making a spot weld are listed below and shown but before spot welding one must make sure that (i) The job is clea
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd