Break even point, Cost Accounting

Assignment Help:

Campground Inc. is considering the production and sale of propane lamps. Annual fixed costs associated with the project are expected to total $60,000. In addition, each lamp would sell for $12 and would require $7 in variable costs. Calculate (a) the break even point in units, (b) the break even point in dollars, (c) the number of lamps that must be sold to earn a profit of $120,000, and (d) the operating income or loss at a sales volume of 16,000 lamps
PretPretty Pillows, Mfg., manufactures silk throw pillows. Last month the company produced 3,890 pillows. Using job order costing, determine the product unit cost for one pillow based on the following costs: production facility utilities, $1,600; depreciation on production equipment, $650; indirect materials, $400; direct materials, $5,300; indirect labor, $1,000; direct labor, $3,500; sales commissions, $4,000; president's salary, $8,000; insurance on production facility, $1,000; advertising expense, $900; rent on production facility, $6,000; rent on sales office, $4,000; and legal expense, $600. Round your answer to two decimal places.


Related Discussions:- Break even point

Cost accounting, cost accounting as a descriptive/analytical discipline

cost accounting as a descriptive/analytical discipline

What is bep, BEP- Break Event Point: It shows no Loss and no Profit The ...

BEP- Break Event Point: It shows no Loss and no Profit The level of activity at which, total revenues equivalent total costs. A point at which there is no profit and no loss.

Compute the internal rate of return, ABC bond is a 20-year bond with face v...

ABC bond is a 20-year bond with face value $1000. The coupon payment is $25 per 6 months. The semi-annual yield is 4%. Use the PV function in Excel (or equivalent) to Önd the price

Changes in recreational use value - water quality, You perform a travel cos...

You perform a travel cost study that looks at the relationship between the cost of visiting a lake (including costs of travel, value of time spent not working & any entry fees), it

What is the predetermined overhead rate, Morrow Company applies overhead ba...

Morrow Company applies overhead based on direct labor hours. At the beginning of the year, Morrow estimates overhead to be $620,000, machine hours to be 180,000, and direct labor h

Accelerated cost recovery system - acrs, ACRS is a system of depreciation s...

ACRS is a system of depreciation started by the Economic Recovery Tax Act of 1981. ACRS depreciation relies on recovery periods in spite of useful life. These periods were preset b

Standard costing, Standard Costing A standard cost is a predetermined ...

Standard Costing A standard cost is a predetermined calculation of how much is supposed to be incurred under specific particular working conditions. It is not an average of pa

Determine the direct materials cost variance, Question P A RT A ...

Question P A RT A Borrico ltd manufacture a single product and they had currently introduced a system of budgeting and variance analysis. The subsequent information i

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd