Blow hole and pin hole porosity, Other Engineering

Assignment Help:

Blow Holes

                  (i) Excessive moisture in the moulding sand.

                  (ii) Low permeability and excessive fine grain sands.

                  (iii) Cores, neither properly baked not adequately vented.

                  (iv) Extra hard rammed sand.

                  (v) Rusted and damp chills, chaplets and inserts.

                  (vi) Excessive use of organic binders.

        Remedies

                   (i) Control moisture content.

                   (ii) Use clean and rust free chills, chaplets and metal insert.

                   (iii) Bake cores properly.

                   (iv) Proper use of organic binders.

                   (v) Cores and moulds should be properly vented.                                               

   (vi) Moulds should not be rammed excessively hard.  

Porosity or Pin Holes : Surface reactions sometimes cause subsurface porosity or pinholes. In aluminium alloys containing more than about 1% magnesium, magnesium reacts with water vapor of the mould to form H2 gas resulting in hydrogen filled pinholes at the surface, as shown in figure.

          In steel castings subsurface pinholes may result from incomplete de oxidation of the molten metal.

          Causes

                    (i) High pouring temperature.

                  (ii) Less flux used.

                  (iii) Gas dissolved in metal charge.

                  (iv) High moisture and low permeability in mould.

          Remedies

                   (i) Ensure effective degassing.

                   (ii) Reduce moisture and increase permeability.

                   (iii) Increase flux proportions.


Related Discussions:- Blow hole and pin hole porosity

Ubiquitous networks, Ubiquitous network applications are generally designed...

Ubiquitous network applications are generally designed for a whole network. This notion should be reflected in the way a network is programmed. We believe that providing abstractio

Electro-mechanical fuel control, Electro-mechanical fuel control: The s...

Electro-mechanical fuel control: The start fuel valve and ignition are energised as soon as rotation (3%) is sensed by an Electronic Sequence Unit (ESU). At 14% and with risin

Functional checks of chemical de-icing systems, FUNCTIONAL CHECKS OF CHEMIC...

FUNCTIONAL CHECKS OF CHEMICAL DE-ICING SYSTEMS: Once the correct flow rate of the fluid supply has been established the distribution of the fluid flow over the blades should be

modified internal rate of return mirr, MODIFIED INTERNAL RATE OF RETURN (M...

MODIFIED INTERNAL RATE OF RETURN (MIRR) This method is a financial analysis to rank alternative investment projects of equal size. This method is modification of internal rate of r

Logic gate-or gate , logic gate-OR gate  Figure shows the symbol that r...

logic gate-OR gate  Figure shows the symbol that represents a 2 input OR gate together with its truth table. This gate will adopt a 1 state at its output terminal when either

Propeller overspeed governors, PROPELLER OVERSPEED GOVERNORS: These dev...

PROPELLER OVERSPEED GOVERNORS: These devices protect against overspeed, they are separate governors to the P.C.U. and direct oil during an overspeed situation to coarsen the bl

Assembly buildings - common fault, Assembly buildings - fire risk assessmen...

Assembly buildings - fire risk assessment: Common faults found in assembly buildings are: Combustible items left in protected routes or bedroom corridors Locked exi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd