Problem 1 (Problem 23, page 507) At a machine tool plant, five jobs must be completed
each day. The time it takes to do each job depends on the machine used to do the job. If a
machine is used at all, there is a setup time required. The relevant times are given in Table
20. The companys goal is to minimize the sum of the setup and machine operation times
needed to complete all jobs. Formulate and solve (with LINGO) an integer programming
problem whose solution will do this.
i''m not sure how to start the variables and constraints or how to write it into a lingo program

Related Discussions:- assignment 2012

Sequencing problem, if one no. is repeated 2-3 times in machine-1 and machi...

if one no. is repeated 2-3 times in machine-1 and machine-2 what is to be prefer first

Modi Method, a manufacture wants to ship 8 loads of his product as shown be...

a manufacture wants to ship 8 loads of his product as shown below. The matrix gives the mileage from origin to the destination D.

Queuing theory, A certain type of machine breaks down at an average rate of...

A certain type of machine breaks down at an average rate of 5/hour. the break down is in accordance with Poisson process.cost of idle machine hour is $15/hour. 2 repairmen Peter an

#title scope.., scope of the operation research in modern management?

scope of the operation research in modern management?

Linear Programming, A paper mill produces two grades of paper viz., X and Y...

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

One sample runs test - hypothesis testing, ONE SAMPLE  RUNS  TEST A ...

ONE SAMPLE  RUNS  TEST A number of  methods have been  developed fro  judging the randomness of samples on the basis of  the order in which  teh observations  are taken. It is

Quantitative research methods, Select one of the topics listed 1-6 below ...

Select one of the topics listed 1-6 below and outline a programme of quantitative research for its investigation.  The assignment  should cover issues of sample design, instrumen

Two handed process chart of signing a latter, Two Handed process Chart of S...

Two Handed process Chart of Signing a Latter     A multiple  activity  chart  records the related  sequence of activities  of more  than one subject, men  and / or  machine  o

Complete decision making process , Operation research is only a Tool of Ana...

Operation research is only a Tool of Analysis and Not the Complete Decision making Process: It should always be kept in mind that O. R alone cannot make the final decision . it

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd