assignment 2012, Operation Research

Assignment Help:
Problem 1 (Problem 23, page 507) At a machine tool plant, five jobs must be completed
each day. The time it takes to do each job depends on the machine used to do the job. If a
machine is used at all, there is a setup time required. The relevant times are given in Table
20. The companys goal is to minimize the sum of the setup and machine operation times
needed to complete all jobs. Formulate and solve (with LINGO) an integer programming
problem whose solution will do this.
i''m not sure how to start the variables and constraints or how to write it into a lingo program

Related Discussions:- assignment 2012

Applications of statistics in management, In a business, statis...

In a business, statistics is used to study the demand and market characteristics of the product or service being sold. In fact, market research

OR, what is operation research an management decision making

what is operation research an management decision making

Regression Analysis, regression line drawn as Y=C+1075x, when x was 2, and ...

regression line drawn as Y=C+1075x, when x was 2, and y was 239, given that y intercept was 11. calculate the residual

Numerical, A paper mill produces two grades of paper viz., X and Y. Because...

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

Modi Method, a manufacture wants to ship 8 loads of his product as shown be...

a manufacture wants to ship 8 loads of his product as shown below. The matrix gives the mileage from origin to the destination D.

Non measurable human factors, Operation research makes no allowance for in...

Operation research makes no allowance for intangible factors such as skill attitude vigor of the management people in taking decisions but in many instances success or fail

Operation research, A paper mill produces two grades of paper viz., X and Y...

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

Transportation and linear programming., #what is the similarity and differe...

#what is the similarity and difference between transportation and linear programing models?

Construction of a mathematical model, The 2 nd phase of operations Resear...

The 2 nd phase of operations Research is to construct a mathematical model representing the system under study. It requires the identification of both static and dynam

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd