Assigning central pier and abutment as fixed piers, Civil Engineering

Assignment Help:

What are beneficial points of assigning central pier and abutment as fixed piers?


Related Discussions:- Assigning central pier and abutment as fixed piers

Hydraulics, What is the head loss in 350 ft of 12 inch diameter 20 years ol...

What is the head loss in 350 ft of 12 inch diameter 20 years old cast iron pipe carrying 1.2 MGD?

CONTOURING METHODS, EXPLAIN THE USE OF INTERPOLATION IN CREATING CONTOUR LI...

EXPLAIN THE USE OF INTERPOLATION IN CREATING CONTOUR LINE

Water treatment, The transmission main from the well field to the community...

The transmission main from the well field to the community is 2500 ft, the velocity of flow at peak pumping capacity is 3.5 fps, water temperature is 10oC, and pH is 7.5. If free c

Surveying, if bearing of AB is 190& that of CB is 260,the included angle AB...

if bearing of AB is 190& that of CB is 260,the included angle ABC is how?

Bending moment , The internal forces in any cross-section of a symmetric me...

The internal forces in any cross-section of a symmetric member in pure bending are equivalent toa couple M The moment of the couple is referred to as the bending moment in the s

What do you mean by internal fiction, Q. What do you mean by Internal ficti...

Q. What do you mean by Internal fiction? Absorptive materials have some elastic fibrous or porous structures that would be extended and compressed at the time of sound wave pro

Impact test - tests on stones, Impact Test: Resistance of stones to ...

Impact Test: Resistance of stones to impact is found by conducting tests in impacting testing machine .It contain of a frame with guides in which a metal hammer weighing 13.

Bleeding test for grout – an essential requirement, Q. Bleeding test for gr...

Q. Bleeding test for grout – an essential requirement? Bleeding is a form of segregation in that a layer of water migrates to surface of the grout at the time of the initial st

Engineering survey, With respect to implementation of Civil Engineering pro...

With respect to implementation of Civil Engineering projects explain the relevance of application of the principle of ''Working from Whole to Part''

12/5/2013 6:34:46 AM

(1) For abutment pier to be assigned as fixed pier at the same time as bridge is quite long, longitudinal loads since earthquake are quite large. As earthquake loads are resisted by fixed piers, size of fixed piers will be huge and enormous. In this relation, for better aesthetic appearance, selection of abutment as fixed piers can accommodate large size and massiveness of piers. On the whole abutments are relatively little in height and for same horizontal force; bending moment induced is smaller.

(2) For central pier to be selected as a fixed pier, bridge deck is allowed to move starting from central pier to end of the bridge. However, if a fixed pier is located at abutment, an amount of movement to be incorporated in each bearing because of temperature variation, shrinkage, etc. is additional than that when a fixed pier is located at central pier. Therefore, size of movement joints is able to be condensed significantly.

 

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd