Analysis and design Of Swimming Pool, Civil Engineering

Assignment Help:
Hi Sir
I have a graduation project part (A) in this semester. I have chosen topic (Analysis and design of Swimming Pool). I got this project ready from friend so I want Presented again. part (A) it will including Introduction, Abstract , Literature Review, Types of Swimming Pools, Geometric Details, Design Aspects, Construction Process of swimming pools, Design Criteria and Problem). Possible that there will be some extra requirements by the supervisor
Can you help me in this project. Provided that the percentage of the copies in the (Turnitin program) are Less than 10%

Related Discussions:- Analysis and design Of Swimming Pool

Enthalpy, h = u + pv is a combination of properties and hence must also be ...

h = u + pv is a combination of properties and hence must also be a property.  h is the SPECIFIC ENTHALPY in kJ/kg  H = U + pV is the ENTHALPY in kJ

Determine the preliminary settlement analysis, Preliminary settlement analy...

Preliminary settlement analysis for a building indicated a settlement of 50 mm in 4 years and an  ultimate  settlement  of  250 mm.  The average pressure increment in the clay stra

CUBE STRENGTH, IN CASE CUBE IS FAIL WHAT CAN IDO

IN CASE CUBE IS FAIL WHAT CAN IDO

Gg, ggggggggggg

ggggggggggg

Physical evaluation of food grains, Q. Physical evaluation of food grains? ...

Q. Physical evaluation of food grains? Food grains are judged for quality by their physical, chemical and microbiological examination. The physical examination includes chec

What do you mean by manhole loss, Q. What do you mean by Manhole loss? ...

Q. What do you mean by Manhole loss? Manholes are provided in locations where there are changes in direction, size and gradient of gravity pipelines. Generally practice for str

Shear slump and collapse slump in slump tests, Question What is sign of sh...

Question What is sign of shear slump and collapse slump in slump tests? Answer There are three varieties of slump that might occur in slumps test, specifically, slump, shear

Calculate the square foot of contact area for the formwork, A concrete crew...

A concrete crew will use the available steel form panels measuring 2'-6" wide x 4'-0" high to construct a 40'-6" long by 3'-2" high by 1'-6" wide concrete knee wall. The square

Mechanics problem, i am facing some problem in solving the problem of elong...

i am facing some problem in solving the problem of elongation due to self weight suspended from fixed support in the conical bar

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd