Define the thiem equations for confined aquifers, Civil Engineering

Assignment Help:

Define the Thiem Equations for Confined Aquifers  

Using natural log:  Q = 2ΠKm(h2 - h1)/ln(r2/r1)      m = aquifer thickness (ft)

Using log10:   Q = 2Km(h2 - h1)/((1,055)log(r2/r1)) 

 


Related Discussions:- Define the thiem equations for confined aquifers

Show the probable type of clay mineral, The liquid limit and plastic limit ...

The liquid limit and plastic limit of clay are 100% and 25%, respectively. From a hydrometer analysis it has been found that the clay soil having of 50% of particles smaller than 0

Is kerb necessary in road pavements, Question Is kerb necessary in road...

Question Is kerb necessary in road pavements? Answer In universal, kerbs are crucial in road pavements due to next cause- (i) They supply strength to sides of road

Pavement design, differences between highway pavement and airfield pavement...

differences between highway pavement and airfield pavement

Geofabric strengthening of perth soils, I need technical assistance. The pr...

I need technical assistance. The project is incomplete. I need someone to proofread it. Do you have someone who know Plaxis, Slope/W and Flac?. Can you arrange a case study for Geo

Engeneering surveying, demonstrate your understanding of the term setting o...

demonstrate your understanding of the term setting out

Concrete, what are the appropriate methods of concreting

what are the appropriate methods of concreting

Main function of followers in driven h-piles, Question What is main fun...

Question What is main function of followers in driven H-piles ? Answer A follower is an extension between pile head and hammers which transfers blow to pile in which

Define the ignitability - hazardous waste, Define the Ignitability - Hazard...

Define the Ignitability - Hazardous Waste - is a liquid with flash point - Not a liquid and capable of spontaneous and sustained combustion under normal conditions - Ign

Analysis of the two stage construction, A County is planning to build a new...

A County is planning to build a new roadway connector in the rapidly developing area of the county. The road can be built at a reduced capacity now for $30 million and can be widen

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd