Airport management, Civil Engineering

Assignment Help:

Airport Management:

Airlines

(a)        Adequate space for each airline for ticketting, check-in and baggage handling, and

(b)       Adequate space for airline staff.

Airport Management

(a)        Adequate space for office,

(b)       Arrangement for security checks,

(c)        Arrangement for baggage trolleys, and

(d)       Good arrangement for trans-shipment of passengers from gate to aircraft, preferably through aerobridge or otherwise by buses.

Community Requirement

(a)        Adequate space for sitting for friends/relatives who have come to receive/send off passengers, and

(b)       Good surface transport arrangement from city to terminal.


Related Discussions:- Airport management

Determine the cubic yard in the ground, An earthwork contractor encountered...

An earthwork contractor encountered a location within the borrow area where the geological conditions changed.  Instead of encountering 100 cubic yards of wet clay, the contractor

Construction management, pert disadvantages of software support, datacolle...

pert disadvantages of software support, datacollection , interpretation of results issues

The senior project, I want to know what materials should I use for roofing ...

I want to know what materials should I use for roofing on the steel truss roof for a storage building 18x60 sqft

Define the rectangular weirs, Define the Rectangular Weirs Sometimes re...

Define the Rectangular Weirs Sometimes referred to as "sharp crested weirs" if the top edge of the weir plate is narrow

Shoes of prefabricated drains, Q. Shoes of prefabricated drains? Shoes ...

Q. Shoes of prefabricated drains? Shoes are generally installed in prefabricated drains for the below : (i)  It avoids the entry of soils in the mandrel by sealing it at the

Cross sectional area to be excavate for roadway construction, The Table pro...

The Table provides the cross-sectional areas to be excavated for the roadway construction. The volume of earth to be excavated (yd 3 ) between section 83+65.6 and 85+98.5 is most n

Length is constructed in first phase of construction, In construction of a ...

In construction of a two-span bridge (span length = L) by using span-by-span construction, why is the length of about 1.25L bridge segment is constructed in first phase of construc

Soil classification - road materials, Soil Classification: Based on p...

Soil Classification: Based on particle size, the soils can be classified as under, adopting the IS soil classification system: 0.002   0.075   0.425   2.36     4.75

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd