Aggregate technical and commercial loss, Electrical Engineering

Assignment Help:

Aggregate Technical and Commercial Loss

It is unfortunate in that addition to T&D losses, there is also a loss in revenue because of non-realisation of billed demand which leaves a portion of the units billed as unrealised units.  This commercial loss is further to the commercial losses up to the point of billing. The aggregate of T&D loss and loss since of non-realization of billed demand is termed as "AT&C loss" (Aggregate Technical and Commercial loss). The T&D losses have always been computed taking within account electricity bills issued to consumers as accrued income and not on actual collection. Therefore, T&D loss figures do not capture the major gap between the billing and the collection, except from the large amount of theft not captured in billing. The AT & C losses take this gap into account. Therefore, AT&C loss to the utility is the sum total of technical losses, commercial losses and loss due to non-realisation of total billed units. AT&C loss for a year is also expressed as percentage of Energy Input. It is the difference among units injected within the system and the units for that the payment is collected.

AT&C loss is a transparent measure of the whole efficiency of the distribution business as it measures technical as well as commercial losses. The schematic diagram display below captures the necessary elements of AT&C losses and is translated within terms of units both at the physical level of transmission and distribution and at the financial level of billing and collection.


Related Discussions:- Aggregate technical and commercial loss

Digital versions of band-pass filter, A case study is required for developm...

A case study is required for development of different digital versions of band-pass filter corresponding to its analogue prototype described by the following normalised transfer fu

Distribution - salient features of nep, Distribution: This has been re...

Distribution: This has been recognized as the most critical segment of the electricity business. Here the NEP calls for proper restructuring of distribution utilities for achi

Electrical fault which might occur in a circuit, Question 1: (a) Descri...

Question 1: (a) Describe the three main types of electrical fault which might occur in a circuit. (b) What is three phase electric power? Give its advantages. (c) Explain th

Single sinusoid, Power up the "TIMS" unit by using the switch at the back. ...

Power up the "TIMS" unit by using the switch at the back. Connect the Pico Virtual Instrument (PicoScope) to the PC as per Appendix 1 On the "TIMS" unit, connect the 2 kHz (s

What do you mean by counters, Q. What do you mean by Counters? The shif...

Q. What do you mean by Counters? The shift register can be used as a counter because the data are shifted for each clock pulse. A counter is a register that goes through a pred

Determine the flux, Q. Consider themagnetic circuit of Figure. Let the cros...

Q. Consider themagnetic circuit of Figure. Let the cross-sectional area AC of the core, be 16 cm 2 , the average length of the magnetic path in the core lC be 40 cm, the number

Can you explain twos complement division, Q. Can you explain twos Complemen...

Q. Can you explain twos Complement Division? 2's complement division is repeated 2's complement subtraction. The 2's complement of the divisor is calculated, and then added to

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd