Q. Advantages of subscriber loops signalling?
(i) Information can be exchange between processors much more faster than when channel associated signalling is used.
(ii) As a result, a much wider repertoire of signals can be employed and this enables more services to be provided to customers.
(iii) Signals can be changed or added by software modification to provide new services.
(iv) There is no longer any requirement for line signalling equipments on each junction that results in a considerable cost saving.
(v) As there is no line signalling, junctions canbe used for calls from B to A in addition to calls from A to B. Both wayworking needs fewer circuits to carry the traffic than if separate groups of junctions are provided from A to B and from B to A.
(vi) Signals relating to a call can be transmitted when the call is in progress. This allows customers to alter connections after they have been set up. For instance a customer can transfer a call elsewhere, or request a third party to be connected in to an existing connection.
Role of Electricity Regulatory Commission in KPI The new Electricity Act, 2003, has empowered Electricity Regulatory Commission (ERC) to play an extremely decisive role in all
Im doing my final year project and Im stuck in vhdl coding. The main mission of this project is to design and build a tap changer which is going to be fitted to power transformers
Systemic Requirements: A robust GIS solution for a distribution utility comprises the subsequent: GIS application and database software should be OGC (Open Geospatial
Q. Two 1150:115-V transformers are to be inter connected for (a) 2300:230-V operation, and (b) 1150:230-V operation. Show the interconnections and appropriate polarity markings.
Q. From a three-phase, 60-Hz system, through a motor-generator set consisting of two directly coupled synchronous machines, electric power is supplied to a three-phase, 50-Hz syste
E n e r gy Band Diagram Energy band diagram in qualitative form is sketched by following the following process: 1. The semiconductor device is supposed to be ma
explain about signal
The normalized signal xn(t) has a bandwidth of 10 kHz and its power content is 0.5 W, while the carrier Ac cos 2πfct has a power content of 200W. Find the bandwidth and the power c
Q. Consider an upgrade of a three-phase transmission system in which the operating line-to-line voltage is doubled, and the phase or line currents are reduced to one-half the previ
when i/p voltg is grater than battery diode is clse or open
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd