Activities to preparing long-term plans, Electrical Engineering

Assignment Help:

Activities to Preparing Long-term Plans

1. Data collection regarding existing loads, forecast of expected loads, operating conditions, and etc. from Grid substation up to consumer level.

2. Mapping of existing system.

3. Analysis   of   existing   system.

(Voltage regulation, T&D losses in existing system, Adequacy of backup system)

4. Load forecast.

5. Plan for upgrading the network.

6. Technology options involving integration of characteristics for modernization of system.

7. Evaluation of several alternatives for least cost optimal solution.

8. Firming up of scope of works.

9. Preparation of cost estimates.

10. Phasing of their cost and works.

11. Financial analysis.


Related Discussions:- Activities to preparing long-term plans

Major advantages of fet transistors over bjt transistors, Q. What the major...

Q. What the major advantages FET transistors over BJT transistors? a. BJT transistor (bipolar junction transistor) is a bipolar device - the prefix bi-revealing that the conduc

Find the transmitters unmodulated carrier power, At the transmitter in a st...

At the transmitter in a standard AM system, P f = 50 W. In the receiver (S 0 /N 0 ) AM = 250 when (S i /N i ) AM = 3000. Find the transmitter's unmodulated carrier power and t

Determine voltage - current and the power, Q. Determine v, i, and the power...

Q. Determine v, i, and the power delivered to elements in the network given in Figure. Check whether conservation of power is satisfied by the circuit.

Define embedded system according to wayne wolf and todd, Define the term em...

Define the term embedded system according to Wayne Wolf and Todd. According to Wayne Wolf: This is any device which includes a programmable computer but is not itself intend

Power suppliers, Normal 0 false false false EN-IN X-N...

Normal 0 false false false EN-IN X-NONE X-NONE POWER SUPPLIERS

Explain working of three-phase transformers, Q. Explain working of three-ph...

Q. Explain working of three-phase transformers? Transformation in three-phase systems can be accomplished in either of two ways: (1) connecting three identical single-phase tra

MATLAB support for fault analysis in transmission lines, The devices in pow...

The devices in power system shown in Figure 2 have the following ratings: G1 : 100 MVA, 13.8 kV grounded Y, X” = 0.15 pu, X2 = 0.015 pu Xo = 0.05 pu G2 : 50 MVA, 20.0 kV grounded

Calculate motor efficiency, 1. A self excited shunt generator supplies a lo...

1. A self excited shunt generator supplies a load of 12.5 kw at 125 volts. The field resistance is 25 ohms and the armature resistance is 0.2 ohms. The total voltage drop because o

Key performance indicators in business, Key Performance Indicators in Busin...

Key Performance Indicators in Business Significance of Key Performance Indicators (KPIs) in the business of power especially within a change environment due to partial deregul

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd