Activities to preparing long-term plans, Electrical Engineering

Assignment Help:

Activities to Preparing Long-term Plans

1. Data collection regarding existing loads, forecast of expected loads, operating conditions, and etc. from Grid substation up to consumer level.

2. Mapping of existing system.

3. Analysis   of   existing   system.

(Voltage regulation, T&D losses in existing system, Adequacy of backup system)

4. Load forecast.

5. Plan for upgrading the network.

6. Technology options involving integration of characteristics for modernization of system.

7. Evaluation of several alternatives for least cost optimal solution.

8. Firming up of scope of works.

9. Preparation of cost estimates.

10. Phasing of their cost and works.

11. Financial analysis.


Related Discussions:- Activities to preparing long-term plans

Hamming window and zero padding, This question investigates the effect of e...

This question investigates the effect of extending the data set with zero-padding & of the appropriate time in the workflow to apply a window function. To get finer resolution in t

Covalent bonding, Covalent Bonding Exhibited through the diamond la...

Covalent Bonding Exhibited through the diamond lattice semiconductors. Each atom enclosed by four nearest neighbors, each comprising four electrons in the outermost orbi

Evaluate maximum directive gain, Q. For a pyramidal-horn antenna, the maxim...

Q. For a pyramidal-horn antenna, the maximum directive gain is given by occurring when the aperture dimensions are A ∼ = √3λLandB = 0.81A. The principal-plane beam- widths

Ohmic region operation, Q. In a depletion MOSFET for which V P = 3 V and I...

Q. In a depletion MOSFET for which V P = 3 V and I DSS = 11mA, the drain current is 3mA when v DS is set at the largest value that will maintain ohmic region operation. Find v G

Derive the expression for steady state error, Derive the mathematical expre...

Derive the mathematical expression for steady state error of first order system with unit ramp signal. Discuss the following - proportional cum integral control - proporti

Lossy transmission line, Q. The model of an elemental length of a lossy tra...

Q. The model of an elemental length of a lossy transmission line is shown in Figure (a), along with its parameters, where R is series resistance per unit length, L is serie

Waveguides, Why are waveguides not used at low frequencies?

Why are waveguides not used at low frequencies?

Explain about the chrominance signal, a. Determine how color sync burst and...

a. Determine how color sync burst and H deflection sync vary in amplitude and frequency. Also explain the difference in timing among the 3.58 MHz color sync burst and 3.58 MHz chro

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd