1. Data collection regarding existing loads, forecast of expected loads, operating conditions, and etc. from Grid substation up to consumer level.
2. Mapping of existing system.
3. Analysis of existing system.
(Voltage regulation, T&D losses in existing system, Adequacy of backup system)
4. Load forecast.
5. Plan for upgrading the network.
6. Technology options involving integration of characteristics for modernization of system.
7. Evaluation of several alternatives for least cost optimal solution.
8. Firming up of scope of works.
9. Preparation of cost estimates.
10. Phasing of their cost and works.
11. Financial analysis.
Q. What the major advantages FET transistors over BJT transistors? a. BJT transistor (bipolar junction transistor) is a bipolar device - the prefix bi-revealing that the conduc
At the transmitter in a standard AM system, P f = 50 W. In the receiver (S 0 /N 0 ) AM = 250 when (S i /N i ) AM = 3000. Find the transmitter's unmodulated carrier power and t
Q. Determine v, i, and the power delivered to elements in the network given in Figure. Check whether conservation of power is satisfied by the circuit.
Define the term embedded system according to Wayne Wolf and Todd. According to Wayne Wolf: This is any device which includes a programmable computer but is not itself intend
Normal 0 false false false EN-IN X-NONE X-NONE POWER SUPPLIERS
show a schematic diagram of michelson interferometer
Q. Explain working of three-phase transformers? Transformation in three-phase systems can be accomplished in either of two ways: (1) connecting three identical single-phase tra
The devices in power system shown in Figure 2 have the following ratings: G1 : 100 MVA, 13.8 kV grounded Y, X” = 0.15 pu, X2 = 0.015 pu Xo = 0.05 pu G2 : 50 MVA, 20.0 kV grounded
1. A self excited shunt generator supplies a load of 12.5 kw at 125 volts. The field resistance is 25 ohms and the armature resistance is 0.2 ohms. The total voltage drop because o
Key Performance Indicators in Business Significance of Key Performance Indicators (KPIs) in the business of power especially within a change environment due to partial deregul
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd