Acidity and Alkalinity - Chemical Characteristics of Water
Acidity:
Capacity to neutralize bases and is a measure of acids in water. Acidity is measured by titrating the sample using a standard base solution to raise to a pH of 8.3
Alkalinity:
Ability of water to neutralize acids, caused mainly by bicarbonate, carbonate and hydroxyl ions.
Alkalinity (eq/m3) = HCO3-, bicarbonate (eq/ m3) + CO3-2, carbonate (eq/ m3) + OH-, hydroxyl (eq/ m3) - H+, hydrogen (eq/ m3)
For all practical purposes the last two terms can be ignored for natural water samples. Even carbonate concentrations are very low in the natural pH range thus leaving mainly bicarbonate as the cause of alkalinity.
Convert alkalinity from eq/m3 into mg/l as CaCO3 by multiplying with 50 (EW of CaCO3)
Alkalinity is measured by titrating the sample with a standard acid to a pH of 4.5.
What is WBM road. How it is constructed?
An undisturbed sample of sand has a dry weight of 18.9 N and a volume of 1143 cm 3 . The solids have a specific gravity of 2.72. Laboratory tests indicate void ratios of 0.40 and 0
what is snowcem?
differentiate between Dumpy level:The Wye or Y level:Cooke''s reversible level: Cushing''s level:Tilting level and Automatic level
HIGHWAY TRANSPORTATION: Broadly, there are two classes of roads: (a) Urban, and (b) Rural (Non-urban). Urban roads are those which are located within tow
any new innovative metods to protct building from disater
A piece of clay taken from a sampling tube has a wet weight of 1.553 N and volume of 95.3 cm 3 . After drying in an oven for 24 hours at 105°C, its weight 1.087 N. Suppose the spec
Roads in Hilly Areas: (a) The alignment selected should attain the changes in elevation by adopting the ruling gradient to the maximum length. Limiting and exceptional
what are the basic reqiureents for stairs. explain the basic procedures for stair construction
A project requires that activities A and B can be started independently and activities C and D are independent but can be started after A and B have been completed. Activity E can
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd