You are working as a project analyst for the local gas utility, and you have been placed on a project to install an 11,000 foot segment of gas transmission line. The initial schedule called for 500 feet of pipeline to be installed each week, with the total construction cost projected to be $25 million. After 8 weeks, 4750' of pipeline has been installed at a cost of $11.25 million.
a. What is the original estimated duration of the project?b. What is the expected duration given productivity experienced? What is the earned value after 8 weeks?c. Is the project over or under budget after 8 weeks? By how much?d. Is the project ahead or behind schedule? By how much relative to the original schedule?e. What is the forecast final cost of the project?
An open test tube at 293 K is filled at the bottom with 12.1 cm of Hg and 5.6 cm of water is placed above the mercury. Calculate the pressure at the bottom of the test tube if the atmospheric pressure is 756 mm Hg.
After moving the bubble four divisions off center, the reading is 1.410 m. For 2-mm vial divisions, what is (a) the vial radius of curvature in meters and (b) the angle in seconds subtended by one division
Water is used in a heat exchange to cool 5 kg/s of air from 400 C to 200 C. Calculate (a) the minimum mass flux (kg/s) of the water and (b) the quantity of heat transferred (MJ) to the water each second.
Two particles start from the same point along the same straight line and at the same instant. The first particle travels with a constant velocity v and the second with a constant acceleration.
Water is flowing at a depth of 10 ft with a velocity of 10 ft/s in a channel of rectangular section. Find the depth and change in water surface elevation caused by a smooth upward step in the channel bottom of 1 ft.
The soil undergoes shear failure and reaches critical state on this plane when the pore-water pressure is increased to 120 kPa while keeping the total normal and shear stresses constant.
Determine the runoff rate at t = 15.0 hr from a two storm system if the first storm drops 2.0-inches starting at t = 0, and the second storm drops 5.0-incheds starting at t = 12.0 hrs.
the pressure drop over 15 m of 2-cm diameter galvanized iron pipe is measured to be 60 Pa. If the pipe is horizontal, estimate the flow rate of water. use for water v=10^-6 m^2/s and density of water = 1000kg/m^3
A company facing an interest rate of 8% must choose among projects offering the following four-year cash flows. If the company is employing the net present value criterion, which project should they choose
Estimate the median and 90th percentile load of SS contained in the runoff. Note: COV = coefficient of variance
The initial velocity of a 15-lb block is given as mv1=15i+15j (ft/s). A force defined by F=250i-250tj (lb) acts on the particle from time t=0 to time t=0.3 s for a total duration of 0.3 s.
In a falling-head permeability test the initial head of 1.5m dropped to 0.5m in 4 h the diameter of the standpipe being 5mm. The soil specimen was 200mm long by 100mm in diameter.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd