Write the general mass balance equation for the rinse tank

Assignment Help Civil Engineering
Reference no: EM13303491

To remove the solution containing metal from a part after plating the part is commonly rinsed with water. The rinse water is contaminated with metal and must be treated before discharge. The Shiny Metal Plating Co. The plating solution contains 85mg/L of nickel. The parts drag out 0.05 L/min of plating solution into the rinse tank. The flow of rinse water into the rinse tank is 150 L/min. Write the general mass balance equation for the rinse tank and estimate the concentration of nickel in the wastewater stream that must be treated. Assume that the rinse tank is completely mixed and that no reactions take place in the rinse tank.

Reference no: EM13303491

Questions Cloud

Estimate the three-variable var using eight lags of each : Estimate the three-variable VAR using eight lags of each variable and a constant and save the residuals. Explain why the estimation cannot be begin earlier than 1963Q1. What are the potential advantages of using the variables ?lipt and ?4urt instead ..
Compute the final angular speed of the system : A solid, horizontal cylinder of mass 10.0 kg and radius 1.30 m rotates with an angular speed of 5.50 rad/s about a fixed vertical axis through its center. Determine the final angular speed of the system
Could you register the name as a trade mark : What type of business structure do you think would be the best one to adopt for the particular type of business you have described in question 1, above?
What must be the ballancing item : Abbreviated financial statements for Archimides Levers. If sales increase by 10% in 2011 and all other items, including debt, increase correspondingly, what must be the ballancing item? What will be its value?
Write the general mass balance equation for the rinse tank : To remove the solution containing metal from a part after plating the part is commonly rinsed with water. The rinse water is contaminated with metal and must be treated before discharge. The Shiny Metal Plating Co. The plating solution contains 85..
Calculate the point price elasticity of demand for the firms : Wonder bread is a normal good produced by the Wonder Bakery. Using clearly labeled Demand and Supply curves, show what will happen to the equilibrium price and quantity of Wonder bread in each of the following situations?
At what temperature does the ball just fit through the ring : An aluminum ball does not fit through a brass ring at 20oC. The diameter of the ball is 2.001 cm, At what temperature does the ball just fit through the ring
What is the ocf for this project : The project is estimated to generate $2,650,000 in annual sales, with costs of $840,000. If the tax rate is 35%, what is the OCF for this project?
What will be the mass of the rod at the end of 20 mins : A common commercial process for the production of so-called "Electronic Grade Silicon" (EGS) is the Siemens process (see figure below). EGS is of ultra-high purity, enough to be used for fabrication of microchips.

Reviews

Write a Review

Civil Engineering Questions & Answers

  What rate of superelevation is required for the curve

A new interstate highway is being built with a design speed of 70 mi/h. For one of the horizontal curves, the radius (measured to the innermost cehicle path) is tentatively planned as 2500 ft. What rate of superelevation is required for this curve

  Explain how to compute the disclosure and elevation of a

Reciprocal leveling gives the following readings in feet from a setup near A: on A, 2.071; on B, 8.254, 8.259 and 8.257. At the setup near B: on B, 9.112; on A, 2.926, 2.930 and 2.927. The elevation of B is 1099.600. Compute the disclosure and ele..

  Complete level book entries and calculate reduced levels

Determine the maximum allowable misclose for this engineering survey using the formula based on the munber of instriunent stations used in the work.

  Determine depth that will result upstream during flood event

A 1.5 m diameter culver (concrete barrel, well - rounded entrance) that is 20m long is installed on a slope of 2 percent. The design discharge is 9.5 m^3/sec and the inlet will be submerged but not the outlet.

  Determine what is the minimum do in the river

A stream is in equilibrium with atmospheric oxygen upstream of a waste outfall. The waste outfall creates a BODo of 20 mg/L in the stream. The k(BOD) is 0.4 /day and the k(o2) is 1.4 / day. The stream temperature is 15 degrees Celsius.

  Calculate pi if sample falls with the control charts limits

A sample with a measured background level (Bi) of 22 mg/l was spiked with the equivalent of 30 mg/l without appreciably changing the sample volume. The result for the spiked sample (Ai) was 49.2 mg/l. Calculate Pi and determine if it falls with th..

  Determine by trigonometry the required angle of forces

two forces applied as shown to a hook support. knowing that the magnitude of P is 35 N, determine by trigonometry the required angle if the resultant R of the two forces applied to the support is to be horizontal and the corresponding magnitude of..

  What is the name of the text book and author used

What is the name of the text book and author used for thr course CEE30 in the spring quarter of 2013, at University of California Irvine?

  Describe what reorder point should jill use and why

Cartridges cost $120 each and require 2 weeks to obtain from the vendor. Jill uses (Q,r) policy to control inventory of cartridges. You can assume that there are 50 working weeks in a year.

  Determine the maximum negative moment in each span

determine the maximum negative moment in each span and maximum negative moment at each support. remember that live loads shall be placed so as to cause the greatest effect. specify the method that you used to determine the moments.

  Calculating sand shear strength

Estimate the effective friction angle for the sand (assume c' = 0). Calculate the sand's shear strength (τf) on a horizontal plane at depths of the 20 ft and 50 ft.

  Velocity and acceleration of the flow

The volume flow rate of streams into the pipe is given by QA = 0.02t m 3 /s and that of stream B by QB = 0.008t 2 m 3 /s, where t is in seconds. The exit area of the pipe is 0.01m 2 . Find velocity and acceleration of the flow at exit at t = 1s.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd