Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Write a short presentation on a Drainage project , How you will do it, what program you will use.
Task
Group presentation comprising a report of progress on, and a justification of: A programme of work for the design project How the team plan to collaborate to deliver the overall project outcomes and specifically, which tasks will be undertaken by which students.
The architectural and structural concept and design approach An outline of drainage, highways and geotechnical design concepts
An outline of how construction management and health and safety considerations have been taken into account
An outline of the financial management of the project
An initial review of the sustainability of the project and carbon costing Documentation of Employers Information Requirements (EIR) as an step towards understanding BIM Level 2.
Verified Expert
In the solution, drainage system and highway and geotechnical design has been discussed. All the requirement in the presentation are properly placed including BIM Level 2, architectural and design approach, management and health safety considerations, financial management of project.
A culvert is to be constructed in a bed of sand (e = 0.5) for drainage purposes. The foof of the culvert will be located 3 m below ground surface. Currently the groundwater level is at ground surface.
The design engineer desires a soil with a high clay content because it will help keep water out of the landfill. Which of the available soils appears to be most promising? Why?
Apply the knowledge gained above to develop safe and sustainable solutions to site situations and appraise the solutions developed above to propose the most desirable solution in the circumstances
Drivers must slow down from 65 miles per hour to 55 miles per hour to negotiate a severe curve on a rural highway. A warning sign for the curve is clearly visible for a distance of 110 feet.
an embankment for a highway 30m wide & 1.5m in a compacted thickness is to be constructed from a sandy trucked from a borrow pit.
Determine the total cost function C (T). (Hint: It includes the cost of producing the product and fixed cost.) Find the marginal cost function Cm for producing the product
Natural gas is stored in a spherical tank at a temp. of10oC. At a given initial time, the pressure in thetank is 100 kPa gage, and the atmospheric pressure is 100 kPaabsolute
Determine the magnitude and the point of application the resultant of the four wind forces (distance right of AB, and distance below BC) when a=1.5ft and b=13ft.
What uniform annual series of cash flows over a 12-year period is equivalent to an investment of $5,000 at t= 0, followed by receipts of $600 per year for 11 years and a final receipt of $1,600 at t= 12 of the investor's time value of money is 6% ..
Find the depth of a point below water surface in sea where pressure is 1.006 million N/m^2. (Specific gravity of sea water = 1.025)
The canal shown below is to be widened so that it can carry twice the amount of water. Determine the additional width L required if all other parameters (i.e. flow depth, bottom slope, surface material, side slope) are to remain the same.
Briefly describe the measures that should be considered for the control of corrosion of embedded steel in concrete.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd