Write a particular specification for a cut-to-fill earthwork

Assignment Help Civil Engineering
Reference no: EM131068497

Write a particular specification for a cut-to-fill earthworks operation for a large sports field. Use the SABS 1200 format. You will have to establish realistic values for the density requirement of the fill, quality requirements and tolerances, method of payment and sufficient pay items. Use SABS 1200 DA as a guide. Assume that the ground conditions are unknown and could include rock, hard and soft materials. Also assume that the size of the sports field is not known as the Client has not yet decided if he needs a field for soccer, rugby, cricket or hockey, or all four. Note that the project specification will include a geotechnical report and a series of drawings giving all dimensions, slopes, etc

Reference no: EM131068497

Questions Cloud

Limit the maximum temp gradient in the glass : Plate glass, k= 1.35W/m*K, initiallly at 850K, is cooled by blowing air past both surfaces with an effective surface coeffiicent of 5 W/m^2*K. It is necessary, in order that the glass not crack, to limit the maximum temp gradient in the glass to 1..
Find the probability that exactly 50 will be heads : Generate aprobability histogramof the number of rolls required of two dice before a sum of "7" appears (graphical answer followed by MATLAB code). The MATLAB code should simulate the results of 10,000 experiments of rolling the dice.
Information regarding budgeted sales : Timpco, a retailer, makes both cash and credit sales (i.e., sales on open account). Information regarding budgeted sales for the last quarter of the year is as follows:
How adding bagel sandwiches change mountain bagels profit : How would adding bagel sandwiches change Mountain Bagels' profit? What information would you need before you can determine how introducing bagel sandwiches would affect Mountain Bagels' overall profit?
Write a particular specification for a cut-to-fill earthwork : Note that the project specification will include a geotechnical report and a series of drawings giving all dimensions, slopes, etc
What were the trial court findings in miranda : What factors do you believe the trial court took into consideration when they decided Miranda? Did the Connecticut Supreme Court uphold the trial court's decision?
Explain your monthly master budget and the items included : Explain your monthly master budget and the items included in it, and compare these planned items against what you spent on them last month.
To sell a piece of raw land in alaska : Keith Vaughn is trying to sell a piece of raw land in Alaska. Yesterday, he received two offers. Sally Youngblood offered Keith $10,000 in cash, payable on signing the deed. Billy Budd offered him $11,424, payable one year after signing the deed.
Create a rough budget based on what you believe the costs : In a 1-2 page Word document, use your Amani restaurant business form to create a rough budget based on what you believe the costs and expected revenues should be for the business.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate concentration of dnapl in the water as function

If clean groundwater flows through an aquifer contaminated with a dense non- aqueous phase liquid (DNAPL), calculate the concentration of DNAPL in the water as a function of time if the DNAPL is dissolving into the water at a rate of k1

  Determine the heat loss or gain during the process

A piston-cylinder device contains helium gas initially at 150 kPa, 20 degrees C, and 0.5 m^3. The helium is now compressed in a polytropic process (PV^n = constant) to 400 kPa and 140 degrees C.

  Which is not a factor to consider in software evaluation

Which is not a factor to consider in software evaluation

  You are going to select window type and have two

you are going to select window type and have two alternatives aluminium and wood. the window size is withhigh 1418

  Determine maximum permissible deflection that may be allowed

If this rod is to be used again with an initially straight axis, determine the maximum permissible deflection that may be allowed during testing procedures. Young's Modulus = 210 kN/mm2 and Yield stress of the steel= 240 N/mm2.

  How close will missile get to the spaceship before stopping

The potential energy function of the missile, once it enters the force field, is given by U(x)= 2640(x-76.3)^2 + 1350. what is the force of the force field at x= 40.2 m. How close will the missile get to the spaceship before stopping

  Write expression for velocity of point a in terms of theta

The wheel of radius r rolls without slipping and has an angular velocity w. Write an expression for the velocity of point A in terms of theta and show that the velocities of A and B are perpendicular to one another

  Calculate the force of water hitting a concrete cylindrical

How do you calculate the force of water hitting a concrete cylindrical pole. The velocity of the water is 2 ft/s, the depth of the water is 10 ft, and diameter of the pole is 3 ft. So what would be the total force exerted on the pole by the water?

  Determine what speed will sleeve attain if force is applied

A Newtonian fluid is in the clearance between a shaft and a concentric sleeve. When a force of 600 N is applied to the sleeve parallel to the shaft, the sleeve attains a speed of 1 m/s. If a 1500 N force is applied, what speed will the sleeve atta..

  Calculating largest tolerable internal crack length

Calculate the largest tolerable internal crack length for a 7075-T651 aluminum alloy component that is loaded to a stress one-half of its yield strength without catastrophic fracture.

  What are the total delay and the average delay per vehicle

Assuming D/D/1 queuing, when does the initial queue clear and what are the total delay, the average delay per vehicle, longest queue length (in vehicles), and the wait time of 100th vehicle to arrive (assumin first-in-first-out)

  Design rectangular sections for beams-loads and values given

fy=50000psi, f'c=3000 span of l=28 ft, dead load not including beam weight = 3 k/ft, live load=3 k/ft, p*=0.5pb, concrete weights=150 lb/ft cubed, use h=d+2.5 inch, assume beam weight =10kN/m and phi=0.90

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd