PART 1:

There are many factors that can affect the project schedule. There are unforeseen conditions, such as finding poor soil. The procurement process can also have a major impact on the project schedule. Procurement includes lead-time items, such as contracting for the construction materials or having those materials brought to the construction site at the correct time. Furthermore, the lead-time items may cross a number of different disciplines. All of these lead-time items (and the personnel who use them) must be accounted for in the project schedule.

For this question, imagine that you are working for a construction management firm. The construction project is a steel post-and-beam structure. In your discussion response, detail the procurement process, from the time of being awarded the contract to having the steel on site for placement. In your response, please include a timetable for the duration of the procurement process and discuss the shop-drawing process.

PART II:

Unforeseen conditions are a common occurrence for addition and remodeling projects. The architect and engineer complete as-built drawings by verifying the existing conditions. These as-built drawings are then used for the addition or remodeling project design. As the proposed drawings are completed and the construction has started there still may be problems that require attention.

Suppose that a remodeling project calls for the demolition of a wall. However, it turns out there is a roof drainpipe within the wall cavity that is selected for demolition. The roof drain is now located within an open area and requires the roof drain to be relocated. In your discussion response, answer the following questions:

  • What are steps in the process to relocate the roof drain?
  • What disciplines are required to assist in this relocation?
  • Why didn't the A/E firm locate the roof drain during the initial filed work?
  • Who pays for the relocation?

Please post references in APA format

Reference no: EM13807745

Questions Cloud

Describe the survey-taking experience : Describe the survey-taking experience. Were the questions easy to understand? Did you have any problems with the language or the response categories
Growth of a company to international stature : Teams and teamwork are impacted by the growth of a company to international stature.
The organization of the wbs issues : What are the benefits of being able to assign tasks to team members? How does a responsibility matrix help assign tasks?
Describe the five phases of a project : Determine which project might be implemented and why (e.g. feasibility study, breakeven analysis, etc). Describe the five phases of a project
Working for a construction management firm : For this question, imagine that you are working for a construction management firm. The construction project is a steel post-and-beam structure.
Details for sociological portrait : Details for Sociological Portrait
Use of mann-whitney u test issues : In this case, assume a non-directional hypothesis is appropriate because there are insufficient theoretical and empirical bases to warrant a directional hypothesis.
Write a paper looking in detail at particular religious text : Write a 2-3 page paper looking in more detail at 1) a particular religious scripture or text OR 2) a religious leader or thinker from one of the traditions we have studied.
Future trends financial firm : You have been asked to create a PowerPoint presentation to train a group of new employees for Future Trends Financial Firm on key concepts of emerging markets. Include the following in your presentation:

Reviews

Write a Review

Operation Management Questions & Answers

  Alex was sent to beijing to help local managers solve the

alex was sent to beijing to help local managers solve the problem of growing worker dissatisfaction at their

  Describe the term data redundancy means in database design

Describe what the term data redundancy means in database design. Explain if it is bad and if a normalized database design is always the best design.

  How the employees effectively execute the strategy

Select a company that you believe uses its employees to achieve a competitive advantage. Discuss how the employees effectively execute the strategy and how the company can sustain this position over time?

  Implementing a stakeholder perspective on doing business

memo in which you advise the board of directors how to correct past problems and set up more responsible governance, especially in implementing a stakeholder perspective on doing business.

  Convince the chief executive officer in strategic planning

Imagine that you are an industrial/organizational (I/O) professional taking a new job. The organization is going through reorganization, and strategic planning meetings are taking place. The meetings do not include anyone from human resources (HR)..

  Determine average number of people waiting for service

Time to service for a customer is exp1ntially distributed with a mean of 15 minutes. Illustrate what is total time in system for this service. Determine average number of people waiting for service.

  Impact implementing these alternative approaches

Evaluate the concept of market competitiveness in relation to an organization’s pay system, particularly when it is unable to offer its employees market competitive salaries due to a lack of financial resources.

  Measure distance using metropolitan-rectilinear distance

Measure distance using metropolitan-rectilinear distance.

  Multiple choice questions - strategic management

XYZ, Inc. is making decisions and taking actions with regard to pricing, promotion, and product design of the company's products.

  Does there seem to be a difference among the mean one-way

1 calculate the mean commute time for each city depicted.2 does there seem to be a difference among the mean one-way

  Data were collected from a sample provided by the supplier

A shirt manufacturer buys cloth by the 100 –yard roll from a supplier. For setting up a control chart to manage the irregularities (i.e. loose threats and tears), the following data were collected from a sample provided by the supplier.

  Elucidate how many students on average will be waiting

Average arrival rate is 12 students per hour; also average service rate is 20 students per hour. Elucidate how many students, on average, will be waiting in line at any one time.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd