Word-process the linear programming model

Assignment Help Operation Management
Reference no: EM13217126

Finnish Furniture manufactures tables in facilities located in three cities-Reno, Denver, and Pittsburgh. The tables are then shipped to three retail stores located in Phoenix, Cleveland, and Chicago. Management wishes to develop a distribution schedule that will meet the demands at the lowest possible cost. The shipping cost per unit from each of the sources to each of the destinations is shown in the following table:

FROM

PHOENIX

CLEVELAND

CHICAGO

RENO

10

16

19

DENVER

12

14

13

PITTSBURGH

18

12

12

The available supplies are 120 units from Reno, 200 from Denver, and 160 from Pittsburgh. Phoenix has a demand of 140 units, Cleveland has a demand 'of 160 units, and Chicago has a demand of 180 units. How many units should be shipped from each manufacturing facility to each of the retail stores if cost is to be minimized? What is the total cost?

a) Word-process the linear programming model below.

Variables

Xij = Number of tables shipped from Plant in City i to Retail Store in City j, 

wherei = 1, 2, 3 and j = 1, 2, 3

Objective Function

Constraints

b) Set up the spreadsheet for Excel Solver. Copy and paste the spreadsheet below.

c) Copy and paste the Answer report below.

d) Write the Optimal Solution below. Note: The Optimal Solutions should include the optimal values for the non-zero variables as well as the objective function.

Reference no: EM13217126

Questions Cloud

Determine the largest mass m : the pin c will support a force of 24 knmagnitude.Based on this criterion, you are asked to determine the largest mass m that the frame can safely support.the diameter of pulley at d is given as 0.2 m.find maximum mass m that can be supported by fr..
Determine the initial tension in the cord : The spool has a mass of 75 kg and a radius of gyration . It rests on the inclined surface for which the coefficient of kinetic friction is . If the spool is released from rest and slips at A, determine the initial tension in the cord and the angul..
Determine the average speed : The graph for the motion of a train as it moves from station A to station B is shown. Draw the a-t graph and determine the average speed and the distance between the stations.
Explain what kind of structure does walt disney have : What kind of structure does Walt Disney have (e.g. functional, multi-divisional or something else)? Does the structure seem well suited to the way the Walt Disney creates value?
Word-process the linear programming model : How many units should be shipped from each manufacturing facility to each of the retail stores if cost is to be minimized? What is the total cost?
Determine the maximum velocity reached : A 0.7-lb block rests on top of a 0.5-lb block supported by but not attached to a spring of constant 9 lb/ft. The upper block is suddenly removed. Determine (a) the Maximum velocity reached by the 0.5-lb block, (b) the maximum height reached by the..
Examine real-world business problems : Analyze real-world business problems and generate recommendations for action. Integrate accounting, marketing, finance, management, and economics into a strategic business analysis.
Prepare the optimal solution : Write the Optimal Solution and the Optimal Solutions should include the optimal values for the non-zero variables as well as the objective function.
Determine the range of values : Two slender rods of negligible weight are pin-connected at A and attached to the 18-lb block B and the 80-lb block C. The coefficient of static friction is 0.55 between all surfaces of contact. Determine the range of values of P for which equilibr..

Reviews

Write a Review

Operation Management Questions & Answers

  Illustrate what is the length of a production run in days

Illustrate what is the length of a production run in days. During production, at illustrate what rate will inventory build up. If the manager wants to run another occupation among runs of this item, which needs a minimum of 10 days per cycle for th..

  How mobility of us consumers affect marketing strategy

Explain how the continuing mobility of US consumers as well as the development of big metropolitan areas should affect marketing strategy planning in the future.

  Identify and discuss the trade offs associated supply chain

Identify and discuss the trade offs associated with operating a supply chain that handles both forward and reverse movements as compared

  What is tribal marketing

What is tribal marketing? Why is it important to marketers seeking to understand, predict and influence consumer behavior

  Challenges in leading a multi generational

Challenges in leading a multi generational and/or multi cultural workforces-Need a complente summary for the listed assignment

  Explain the functions of manager

What are the functions of a manager? If you had to pick one as being the most important function, which would it be and why?

  Calculate forecasts for days 11

Using simple exponential smoothing with a smoothing constant of α = 0.2, and the demand and forecast data as given above, calculate forecasts for days 11 through 15. Put your answers in column 3 of the table below.

  Difference in employer support of and domination of union

Discuss the difference between an employer's support of and domination of a union. Compare and contrast the factors the might contribute to employees' voting to decertify a union.

  Describe approach you would take also to develop the plan

Suppose your boss asked you to develop a scheduling plan for a project. Describe what approach you would take also the steps you would follow to develop the plan.

  Software project management is impacting other areas

Software Project Management is impacting other areas such as engineering, construction, information technology, pharmaceuticals, marketing, and operations management

  How macro level factors in an external environment have

Discuss how macro level factors in an external environment could have (or already have) impacted structure of online social networking industry in global marketplace.

  Estimate the average cost for the guidance control

United Research Associates (URA) had received a contract to produce two units of a new cruise missile guidance control. The first unit took 5,000 hours to complete and cost $50,000 in materials and equipment usage.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd