Will the quantity of coarse aggregate incease decrease

Assignment Help Civil Engineering
Reference no: EM13545665

A concrete mix with a 3in slump, w/c ratio of .5, and sand with a fineness modulus of 2.4 contains 1700lb/yd3 of coarse aggregate. Compute the required weight of coarse aggregate per cubic yard. To adjust the mix so as to increase the compressive strength, the water to cement ratio is reduced to .45. Will the quantity of coarse aggregate incease, decrease, or stay the same?

Reference no: EM13545665

Questions Cloud

The results of these tests are summarized in the following : A series of direct shear test has been performed on a dense well grades sand. all tests were performed on 3.00 in diameter, 1.25 in tall cylindrical specimens. and were run slowly enough to produce the drained condition. The results of these tests ar..
Determine the corresponding flood peak of the runoff using : The vertical effective stress at a certain point in a loose sand is 1000lb/ft^2. If an earth quake were to occur, how much excess pore water pressure would need to develop at this point for liquefaction to occur? Show a numerical rationale for your a..
Determine the depth of a french drain saturated depth : Determine the depth of a French drain (saturated depth) if the width is 3.0 feet, the effective permeability of the aggregate is 2000 ft/day, and the rate of discharge for 100 feet of trench is 1000 feet^3/day. The trench slope along the flow line is..
A root of the linear portion of the stress strain relation : A 32mm rebar with a guage length of 200mm was subjected to tension to fracture according to ASTM E-8 method. The load and deformation data were as shown in table below.
Will the quantity of coarse aggregate incease decrease : A concrete mix with a 3in slump, w/c ratio of .5, and sand with a fineness modulus of 2.4 contains 1700lb/yd3 of coarse aggregate. Compute the required weight of coarse aggregate per cubic yard.
How you will place the bars and calculate the location : Concrete cover on both sides. Sketch how you will place the bars and calculate the location of the effective depth. Place as many bars in the lower layers as possible.
How many cubic yards of aggregate must be ordered for a road : How many cubic yards of aggregate must be ordered for a road base 16 inches thick and 2000 feet long with a top width of 30 ft, if the side slopes are one on one, or 45 degree?
What major differences would you expect if the water supply : A large stream flowing through a highly industrialized area must serve as the source of a community's water supply. The turbidity of the water ranges from 30 to 60 NTU, alkalinity exceeds 100 mg/L.
Determine the coliform concentration at the beach : Determine the coliform concentration at the beach. (assume that the current behaves as a plug flow reactor and that the wastewater is completely mixed in the current at the discharge point.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Why the acidic deposition is damaging the valuable forest

A power plant situated 20 km directly upwind from a protected old-growth forest emits SO2 at a rate of 120 g s-1with an effective stack height of 100 m (uH= 2 m s-1). Environmentalists claim that the acidic deposition is damaging the valuable fore..

  Direction of the velecity of the cars after collision

If friction between the cars and the rails is neglected, what were the magnitude and the direction of the velecity of the cars after the collision?

  What is the main difference of prestressed concrete beams

What is the main difference between the calculation of deflections for reinforced and prestressed concrete beams

  Find flow rate and the pressure head at the base of nozzle

The entrance to the pipe is reentrant, with ke = 0.9, and the nozzle loss coefficient is 0.045. Find the flow rate and the pressure head at the base of (entrance to) the nozzle.

  How to compute the normal depth of a trapezoidal channel

A trapezoidal channel with a bottom width of 4 feet and side slopes 2:1 (H:V) and a bed slope of 1 percent conveys a discharge of 50,000 gpm. Assume n = 0.025. Compute the normal depth.

  Define what is meant by the term compile-time binding

Define what is meant by the term compile-time binding and list two other terms that are also used to describe it. Explain why compile-time binding can present problems when implementing polymorphism in a program.

  Sketch a typical floor plan and indicate the tributary

A 10 storey building measures 20m x 40m in plan and has columnslocated on a grid 10m x 10m. The floor consists of a 250mm thick R/C slab with droppanels 3m x 3m x 200mm thick in the vicinity of each column. Live load allowanceis 3.0kPa.

  What is the magnitude of the electrons initial acceleration

An electron is released from rest at a perpendicular distance of 9.9 cm from a line of charge on a very long nonconducting rod. That charge is uniformly distributed, with 9.0 ?C per meter. What is the magnitude of the electron's initial accelerati..

  Calculate the depth of flow 2 km upstream of the dam

A 12.0 m rectangular channel, having a bed slope of 50 cm/km and a Manning roughness coefficient of 0.015, conveys water at a normal depth of 1.0 m. A dam is built across the channel at which the water depth is 2.0 m.

  Define left side as starting and the right side as ending

Create a precedence (activity-on-node) diagram based off the attached activity list. You must follow the below recommendations as we discussed in class. 1) draw nodes as rectangles. It helps define the left side as starting and the right side as en..

  What is force p to move cabinet if caster a and b are locked

what is the force P to move the cabinet if a) caster A and B are locked b) B is locked A is free to move c) A is locked B is free to move p is applied from the left side pushing right. the width of the cabinet from caster a to b is 24 inches.

  Find location of point a on the table by calculating length

A pool player wants to bank ball B off of point A into the side pocket O. The ball has a diameter d = 2.25 in. and a coefficient of restitution e = 0.8 when colliding with the side of the table.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd