Two sites, A & B, are being considered for the construction of a dam. Construction at Site A will cost $20 million and have an annual benefit of $2 million. Construction at Site B will cost $30 million and have an annual benefit of $3 million. The mean occurrence rate (?) of earthquakes at each site is uncertain. At Site A, there is a 60% probability that ? = 0.02 EQ/yr and a 40% probability that ? = 0.04 EQ/yr. At Site B, there is a 70% probability that ? = 0.01 EQ/yr and a 30% probability that ? = 0.02 EQ/yr. Which site should be chosen based on expected monetary value (EMV), considering the expected return period for damaging earthquakes. Damage from an earthquake costs $7 million to repair. Use an interest rate, i = 10% and a 100-year design life for the dam.
The discharge is 15 cubic meters per second with a bottom width=10m and side slopes of 1V:2H. If the discharge is increased to 20 cubic meters per second determine the new depth of flow
A sag vertical curve connects a -1.5%grade and a +1.5% grade on a freight and intercity main linerailway track. If the grades intersect at station (300+25.35)and an elevation of 350.50ft,
An excavation is proposed for a site consisting of a homogenous, isotropic later of silt clay, 14.24 m thick, above a deep deposit of sand. The groundwater is 2m below ground level outside the excavation. The groundwater level inside the excavatio..
A distance of 72.55 ft is recorded using a steel tape weighing 0.016 lb per foot. The tapes is supported only at the ends with a tension of 15 lb. Find the distance corrected for sag.
A long line of burning agricultural waste emits 0.3 g/m/s of particulate matter on a clear fall afternoon with winds blowing 3 m/s perpendicular to the line. Estimate the ground-level particulate concentration 400 m downwind from the line.
Determine the minimum volume of concrete needed to keep the gate(1m wide) in a closed position, with l=2m. Note the hinge at the bottom of the gate
Torque is transferred through two shafts by means of gears. If the diameters of gears B and C are in the ratio 1:2, what should the ratio of shaft diameters be so that both shafts have the same shear stress
An important dimensionless parameter concerned with very high-speed flow is Mach Number, defined as V/c, where V is the speed of the object such as airplane or projectile, and c is the speed of sound in the fluid surrounding the object.
A pressure gage connected between the upstream pipe and throat section shows a pressure difference of 29 kPa. The gasoline velocity in the throat section is 14 m/s. What is the velocity (m/s) in the upstream pipe
Consider a rectangular wastewater treatment cell having a length of 100ft, width of 20ft and depth of 20ft. If the flow into the cell is 50ft^3/min, calculate the residence time of the treatment cell.
The azimuth from station A of a link traverse to an azimuth mark is 212o 12' 36". The azimuth from the last station of the traverse to an azimuth mark is 192o 12' 15". Angles to the right are observed at each station
A contractor wants to build a fill at his new construction site. He has two options for purchasing his borrow material. Site A has a soil with a unit weight of 2.5 kN/m3, a moisture content of 14% and a cost of $8 per cubic meter.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd