Which level should master scheduling take place

Assignment Help Operation Management
Reference no: EM13757275

In an assemble-to-order company, at which level should master scheduling take place?

the component/subassembly level

the end item level

the raw material/component level

it does not matter, any level will do

none of the above levels

Reference no: EM13757275

Questions Cloud

Top three reasons meetings fail-purpose of a meeting : As meetings are visible ways to demonstrate professional competence, it is best to have a reputation of being a(n) In terms of the 4 P's of effective meetings, the purpose of a meeting:  Top three reasons meetings fail: Minutes of a meeting are neces..
Discuss why voici should or should not outsource : Read The Tug-of-War by Yossi Sheffi Case Study (available on BB LEARN), Discuss why Voici should or should not outsource, as you answer refer back to what other people have posted
Schedule of requirements for individual end items : A statement of a schedule of requirements for individual end items is called:
Best regarding the master production schedule : Which of the following statements is best regarding the master production schedule?
Which level should master scheduling take place : In an assemble-to-order company, at which level should master scheduling take place?
Determining the need for labor-machines-physical resources : Determining the need for labor, machines, physical resources to meet the production objectives o the firm is called:
Characteristic of a production plan : Which of the following is a characteristic of a production plan?
Imput to the production plan : Which of the following is an imput to the production plan?
Longest planning horizon and the least level of detail : Which of the following plans has the longest planning horizon and the least level of detail?

Reviews

Write a Review

Operation Management Questions & Answers

  Estimate the net requirement for dark chocolate truffle

Bunny Helpers, Inc. has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of Week 6. An MRP planner has prepared the following table showing product structure.

  Cultural intelligence and nonlinear systems thinking

This discussion will help you build skill in evaluating the interdependent variables that impact the value and trajectory of global leadership development programs in terms of their effectiveness in fostering deep self-awareness and growth as well..

  Describe facts of the case briefly and describe legal issue

Need to describe the facts of the case briefly and describe the legal issue. ( Please include any links used for your research.) Thanks!

  Compute the total cost of ordering and carrying flour

A large bakery buys flour in 25-pound bags. The bakery uses an average of 4600 bags a year. Preparing an order and receiving a shipment of flour involves a cost of $10 per order.

  Prepare an aggregate plan for the coming year assuming

Prepare an aggregate plan for the coming year assuming that the sales forcast is perfect Use a spreadsheet Bradford Manufacturing in the spreadsheet an area has been designated for your aggregate plan solution.

  Find categories of training objectives

Harry is a senior manager at Pine and Acorn Consultancy. He has been assigned the task of establishing the training objectives. First, he makes a list of the individuals to be trained.

  How can the pm reduce the potential effect of these factors

How can the PM reduce the potential effect of these factors and obtain resource commitment as the project is implemented?

  Examine the important concepts and meanings

Examine the important concepts and meanings that are the foundation of training and development literature. Choose the term that was the most foreign to you and discuss its importance in the field.

  Explain why the method is innovative

Explain why the method is innovative and whether you believe the method will really help the environment or will only help the company promote its image as a good citizen.

  Suppose the production manager is asked to reduce

Suppose the production manager is asked to reduce the safety stock of this item by 45 percent. If she does so, what will the new service probability be

  Identify the stages of decline

Discuss why organizational decline occurs, identify the stages of decline, and describe how managers can work to prevent the failure and even the death or dissolution or an organization.

  Develop a customized implementation plan

Develop a customized implementation plan within one month for each customer with maximum technology value but lowest possible cost.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd