When will they be able to see the full sign

Assignment Help Civil Engineering
Reference no: EM13562558

A roadway has a 4% grade intersecting a -7% grade at at station 18+50.00. The grades are connected by an 800 foot vertical curve. A sign is proposed to be installed at Station 15+00.00. The bottom of the sign is 7 feet above the roadway. For drivers heading from Station 40+00 to Station 10 + 00, when will they be able to see the full sign? Assume a driver’s eye is 3 feet above the surface of the roadway.

Reference no: EM13562558

Questions Cloud

What is the total preassure at the bottom of the glass : There is a glass filled with 20cm of water and on top alayer of 30cm of oil, that exactly weights 0.700Newton. What is the total preassure at the bottom of the glass
What volume of air went through in 24hrs : A hi-vol clean filter weighs 18g and the dirty filter wighs 18.6g. the initial and final air flows are 70 and 60 ft3/min.
What is the center of mass velocity at bottom of the incline : A solid cylinder of radius .35m is released from rest from aheight of 1.8m and rolls down the incline without slipping as shown.What is the center of mass velocity at the bottom of the incline
What is the emission rate of carbon tetrachloride from this : A dry cleaning establishment buys 500 gal of carbon tetrachloride every month. as a result of the dry cleaning operation, most of this is lost to the atmosphere and only 50 gal remain to be disposed of.
When will they be able to see the full sign : A roadway has a 4% grade intersecting a -7% grade at at station 18+50.00. The grades are connected by an 800 foot vertical curve. A sign is proposed to be installed at Station 15+00.00
Will the quantty of coarse aggregate increase : A concrete mix with a 3-inch slump, w/c ratio of 0.50, and sand with a fineness modulus of 2.4 contains 1700 lb/yd^3 of coarse aggregate. Compute the required weight of coarse aggregate per cubic yard.
How much would the satellite weigh on the surface : A satellite, mass=5850-kg, is in a circular orbit of 4.1x10^5mabove the surface of a planet, which has a radius of 4.15x10^6m. How much would the satellite weigh on the surface of the planet
Find the ph of this solution and compare it to the result : Assume that H2CO3* dissolves first without dissociating, achieving equilibrium with the atmosphere, and then the solution is closed to the atmosphere. H2CO3* then dissociates (neglect secondary dissociation). Find the pH of this solution and compare ..
What percentage increase will there be in the flow from : Suppose a family of four, living in a home with an area of 100x50ft connects its stormwater drain to the sewer. Assume that 1in of rain falls over 1 day

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate speed of the shockwave foamed by the bottleneck

When stationary, vehicles are spaced at average distance headway of 6 m. It may be assumed that there is a linear relationship between speed and density. When the traffic flow approaching the roadworks is 3500 vehicles per hour

  Determine the change in the entropy to be reversible process

Air mass of 4 kg of liquid water is cooled from 90c to 10c under a constant pressure. Determine the change in its entropy, assuming the process to be reversible.

  Determine the final temperature when valve is opened

An adiabatic piston-cylinder device equipped with a spring maintains the pressure inside at at 300kPa when the volume is 0, and 3000kPa when the volume is 5 m3.

  Calculate the number of gas transfer units

The gas flow rate is 1 kg m-2 s-1 of and the water entering is 1.6 kg m-2 s-1. For this system Henry's law holds and ye=1.75x, where ye is the mol fraction of A in the vapour in equilibrium with a mole fraction of x in the liquid.

  Determine what are air flow and particulate concentration

Three streams of polluted air are combined prior to treatment in an electrostatic precipitator (ESP). The flow and particulate concentration of each stream are 600 cfm at150 mg/m^3, 700 cfm at 200 mg/m^3, and 500 cfm at 1000 mg/m^3.

  What is the stress along the top edge and the bottom edge

A horizontal pre-stressing force of 500kN is applied to rectangler beam. the beam has a depth of 500mm and a width of 250mm. the force is applied at a distance of 80mm below the x-x axis.

  What is the value of x when block comes to rest momentarily

The block is released from rest when the spring is unstretched (at x=0). We wish to show that the ensuing motion of the block is simple harmonic. Call the initial configuration of the system that existing just as the block is released from rest.

  How large of an area would one need to cover with solar cell

Given that the average power plant produces 667 MW of electricity per year, there are 492 coal plants in the US, and a solar constant of 1.361 KW/m^2, how large of an area would one need to cover with solar cells to replace our dependence on coal ..

  Find the mass of the vehicle and the stiffness and damping

An automobile modeled as a single-degree-of-freedom system free to vibrate in the vertical direction. In a free vibration test the amplitude of oscillation is observed to decrease from 20mm to 2 mm in one cycle which takes 3 seconds.

  Determine the new depth if the flow rate remains the same

Overnight a thin layer of ice forms on the surface of a 40-ft-wide river that is essentially of rectangular cross-sectional shape. Under these conditions, the flow depth is 3 ft. During the following day the sun melts the ice cover.

  The corresponding exact length of the aluminum bar

Knowing a .02 in gap exists when the temperature is 75 degrees F, determine(a) the temperature at which the normal stress in the aluminum bar will be equal to -11ksi, (b) the corresponding exact length of the aluminum bar.

  Determine how much butane would be needed to burn

You have a contaminated air stream containing 1000 ppmV of toluene and you decided to incinerate to a DRE of 99.9%. You are using butane as fuel to reach the temperature and consider the lean toluene has no heating value.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd