Reference no: EM131172963
Computer Science
Even if you have a well-planned and controlled project, there is still 1 important but sometimes overlooked area that can impact the success of a project. This very important area is quality management and assurance. There are many quality systems that exist today thanks to the work of pioneers such as Dr. William Edward Deming. You will be evaluating different quality systems such as ISO 9000, Six Sigma, Plan-Do-Check-Act or Plan-Do-Study-Act, capability maturity model integration (CMMI), organizational project management maturity model (OPM3), and Malcolm Baldrige for their potential application to a project you will be selecting in the Individual Project for this week.
Primary Task Response: Within the Discussion Board area, write 350-500 words that respond to the following questions with your thoughts, ideas, and comments. This will be the foundation for future discussions by your classmates. Be substantive and clear, and use examples to reinforce your ideas.
Research at least 2 sources (which may include your textbook) to support your response, and discuss the following:
• Compare and contrast 3 of what you consider the most appropriate types of quality systems for the project that you will use in your Key Assignment.
• In your opinion, which is the best type of quality system? Why?
• Which is the easiest to implement? Why?
Write 2 more paragraphs that are an introduction and conclusion to this topic. Be sure to include your references, and format your submission in APA format.
Despite the fact that the cost of serving these meals
: Respond to the following question with at least three well composed paragraphs: Restaurants typically charge much higher prices for dinner than for lunch, despite the fact that the cost of serving these meals is about the same. Why do you think this ..
|
A decision you have made in your personal
: Think of a decision you have made in your personal, school, or work life that reflects a stronger desire to avoid a loss than to make a gain?
|
What is the minimum required volume of the buoy
: A steel cube 100 mm on a side weighs 80 N. We want to hold the cube in equilibrium under water by attaching a light foam buoy to it. If the foam weighs 470 N/m3, what is the minimum required volume of the buoy?
|
Draw the network
: Draw the network. Describe the critical path. Analyze and explain what is the estimated completion time using the CPM approach. Analyze and explain what is the estimated completion time using the PERT approach.
|
What you consider most appropriate types of quality systems
: Compare and contrast 3 of what you consider the most appropriate types of quality systems for the project that you will use in your Key Assignment.
|
Calculate the maximum allowable weight
: The buoy is made from a uniform material having a specific weight of 8.00 lb/ft3. At least 1.50 ft of the buoy must be above the surface of the seawater for safety and visibility. Calculate the maximum allowable weight of the instrument package.
|
Why are decision mistakes usually accepted in organizations
: Why are decision mistakes usually accepted in organizations but penalized in college courses and exams that are designed to train managers?
|
Find the accounting cost and economic cost associated
: Joe quits his computer programming job, where he was earning a salary of $50,000year, to start his own computer software business in a building that he owns and was previously renting out for $24,000/year. In his first year of business he has the fol..
|
Benefitted from enterprise resource planning
: Find a news item within the past 6 months about a company that has benefitted from enterprise resource planning.
|