Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
If a truck has a capacity of 24m^3 (Heaped) and 18m^3 (struck), with a total empty weight of 31600kg (truck), and needs to move soil at a density of 1850kg.m^3 (Bank) with a swell of 41%, what would the gross truck mass when loaded to heap capacity?
What is the result of a volume change in a saturated cohesive soil because of expulsion of the water occupying the void spaces
What are Engineering Societies based upon the research? List at least 10 discipline specific engineering societies along with their website addresses.
An earthen channel will be excavated into sandy soil for which Vmax = 4.0 ft/sec, n = 0.022, and the recommended m = 3. The channel will have a bottom slope of 0.0011 and accommodate a design flow of 303 cfs. Design (size) the channel section.
The pipe has a flow of 5 m3/s. The stream's chloride concentration just upstream of the pipe's dischage is 12 mg/L, and the runoff pipe's discharge has a chloride concentration of 40 mg/L. Chloride is a conservative substance.
The officer believes the driver is intoxicated and begins accelerating uniformly to 50 mi/h in 8 seconds and maintains a constant velocity of 60 mi/hr, overtakes the motorist 42 seconds after he passed the officer.
A 45-cm-thick, 300-cm-high lightweight concrete masonry unit wall lies on a 20-cm-thick lightweight plain concrete slab. The 20-cm wide slab is supported by a reinforced concrete beam, which is placed on top of two columns (simply supported beam).
an engineer uses a standard technique for measuring the thickness of a clay landfill liner that has a typical standard deviation of 0.7 in. The project specifications require the liner thickness to be 36 inches or more, at least 95 percent of the ..
A load is to be raised 20 ft by the hoisting system. Assuming Gear A is initially at rest, accelerates uniformly to a speed of 120 rpm , determine (a) the number of revolutions exected by gear A in raising the load. (b) The time required to raise ..
A discharge meter to be used in a 40 cm pipeline carrying oil (kinematic viscosity = 10-5 m2/s, density = 860 kg/m3) is to be calibrated by means of a model (1/4 scale) carrying water (T = 20°C and standard atmospheric pressure).
Write a C program that calculates the factorial of the number from 0 to the integer N, which is not greater than 10
Estimate the steady state PM10 concentration assuming a PM10 deposition velocity of 0.12 cm/s, prevailing wind velocity of 2.5 m/s, and a constant emission flux of PM10 0.82 mg/m2-s.
Using a design speed of 50 mi/h, determine the stations and elevations of PVCs, PVIs, and PVTs of the two vertical curves required to connect the highway segments, as well as the length of the constant grade section (connecting grade is to be as s..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd