What will the phosphorus concentration of the river

Assignment Help Civil Engineering
Reference no: EM131371840

Question

The village of Pongelton is in the valley of the River Pong. The mean flow of the river is 3.0 m3/s. The population of Pongelton is 6,000. The daily average water consumption is 250 litre / head / day. Water utilisation (i.e. the water spent for watering gardens, watering animals, etc) is 20%. Sewers are built in the village and the construction of a sewage treatment works is planned.

The local government also wishes to construct a small recreational reservoir downstream of the site of the planned effluent discharge. The Environment Agency requires an assurance that the aquatic environment of the planned reservoir will not be impaired by the discharge of the final effluent from the sewage treatment works. Thus, the Environment Agency will require the sewage treatment works to be designed for phosphorus removal, in order to avoid eutrophication downstream of the discharge. To achieve this, the concentration of phosphorus in the inflow to the planned reservoir must be less than 40 mg/m3. The average phosphorus concentration of household sewage is 10 mg/l and the phosphorus concentration of the unpolluted river, upstream of Pongelton is 10 mg/m3.

You are the designer and must address the following issues:

1. If no treatment facility is provided, what will the phosphorus concentration of the river be downstream of the sewage discharge?

2. Does this value meet the EA's quality requirements?

3. If not, in percentage terms, what degree of treatment should be provided for phosphorus removal. Express your answer in percentage terms (i.e. percentage of phosphorus to be removed)"

Verified Expert

In the village of Pongelton, the valley of the River Pong, population of Pongelton is 6000. And the river flow at 3 m 3 /s. Here we have to find out the concentration of the phosphorus. Here we got the phosphorus concentration 37 mg/L which is slight more than that if the standards set by the environment agency. The extra required removal of phosphorus is 5.714 %.

Reference no: EM131371840

Questions Cloud

When does the done bit of a timer change state : When is the timer-timing bit of a timer instruction true?
Examine at least three examples of quality initiatives : Examine at least three examples of quality initiatives that could increase patient satisfaction and potentially reduce healthcare cost. Support your response with examples of the successful application your chosen quality initiatives.
Find the maximum likelihood test for a observation : ENGI 4053 Statistical Signal Processing Assignment. Find the Maximum Likelihood (ML) test for a single observation x(0) to distinguish between H0 and H1 if
How will the actions of the staff member negatively impact : How would you assess if the patient understands the discharge instructions? How will the actions of the staff member either negatively or positively impact patient care and the patient care experience?
What will the phosphorus concentration of the river : If no treatment facility is provided, what will the phosphorus concentration of the river be downstream of the sewage discharge - Does this value meet the EA's quality requirements?
Girl''s velocity after they push off : They "push off" and travel directly away from each other, the boy with a velocity ofv=0.67m/s to the left.If the boy weighs712Nand the girl weighs 452 N, what is the girl's velocity after they push off? (Consider the ice to be frictionless. Enter ..
Contrast role of mysticism within the abrahamic religions : The role of mysticism is relevant to all of the world religions we have looked at this semester. Compare and contrast the role of mysticism within the Abrahamic religions (Judaism, Christianity and Islam).
Instant the particle reaches its maximum : At t= 0 , a particle leaves the origin with a velocity of 5.0 m/s in the positive y direction. Its constant acceleration is giving as a = (3.0i - 2.0j) m/s^2. At the instant the particle reaches its maximum y coordinate how far is the particle fro..
When is the timer-timing bit of a timer instruction true : State three advantages of using programmed PLC timers over mechanical timing relays.

Reviews

len1371840

1/25/2017 7:01:36 AM

POLLUTION AND WATER QUALITY In picture down question ,This is clarification for this question and there is good course material that help you. If no treatment facility is provided, what will the phosphorus concentration of the river be downstream of the sewage discharge?

Write a Review

Civil Engineering Questions & Answers

  Determine the excess rainfall and runoff volume in inches

Suppose a watershed in Athens, Georgia has 25 acres pasture (CN=70) and 50 acres wooded (CN=55). Determine the excess rainfall (in inches) and runoff volume (cubic feet) assuming the design rainfall is 25-year, 24-hour.

  Determine the appopriate set of pi terms in a tank

The power, P, required by an agitator in a tank is a function of the following variables, diameter of the agitator, D, Frequency of the impeller rotation, w (1/s), Viscosity of liquid, u (lbss/ft^2) and the density of the liquid ,p (slugs/ft^3)

  Why failure of this garden hose occurred near its end

Explain why failure of this garden hose occurred near its end and why the tear occurred along its length. Use numerical values to explain your result. Assume the water pressure is 30 psi.

  Calculate grid lengths for the traverse lines

The horizontal ground lengths of a three-sided closed-polygon traverse were measured in feet as follows: AB = 501.92, BC = 336.03, and CA = 317.88 ft. If the average orthometric height of the area is 4156.08 ft and the average geoid separation is ..

  Calculate required area of air to air heat exchange to cool

Calculate the required area of an air to air heat exchange to cool 20,000 cfm from 1200 F to 400 F. Assume ambient air at 80 F will be heated to 800 F by the exchange.

  Determine the slope of the beam at b

The cantilevered beam is subjected to a couple moment M0 applied at its end. Determine the slope of the beam at B. EI is constant. Use the method of virtual work.

  Design the shear reinforcement

Problem Statement: A rectangular beam having b = 10 in. and d = 17.5 in. spans 15 ft face to face of simple supports. It is reinforced for flexure with three

  Determine the coordinates of intersection of line of action

Replace the given forces by a wrench and determine the coordinates of the intersection of its line of action (the coordinate of point P) with the plate. With a Force Fca=(100i+100j)N coming off of point C

  Determine critical depth in circular pipe of 36 inches dia

determine critical depth in a circular pipe of 36 inches diameter and roughness coefficient of 0.015 The flow rate is 15 cfs , So = 0.002

  What is the minimum required temperture of the boiler

A coal fired steam power plant is to be designed for the purpose of generating electrical power for a city with a population of 60,000 residents. Based on an order-of-magnitude analysis

  What is the expected annual savings

An energy efficiency project has a first cost of $300,000, A life of 10 years, and no salvage value. Assume that the interest rate is 9%. The most likely value for annual savings is $60,000. The optimistic value for annual savings is $80,000 with a p..

  What standard deviation would be expected in a distance

A field party is capable of making taping observations with a standard deviation of +,-0.003m per 30m taped length. What standard deviation would be expected in a distance of 120m taped by this party

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd