What was germosen fixed manufacturing overhead volume

Assignment Help Managerial Accounting
Reference no: EM132521435

Inc. uses a standard cost system with direct labor hours (DLH's) as the application base for manufacturing overhead. Results for the year are below:

Prior to start of the year:

Standard DLH's per unit : 0.20

Planned Production : 800,000 units

Budgeted DLH's (denominator hours) : 160,000

Predetermined Fixed Manufacturing Overhead Rate : $12.48

At the end of the year :

Actual Production : 795,000 units

Actual DLH's : 158,000

Actual Fixed Manfacturing overhead Cost : $936,000

Problem 1: What was Germosen's fixed manufacturing overhead volume variance for the year?

Reference no: EM132521435

Questions Cloud

Replace dielectric between the plates : Plates have air between them in the capacitor and the capacitor is charged K=1, also its isolated. We replace dielectric between the plates (K=2).
Columbus instruments : What are the implications of CIC's approach to staffing project teams? Is the company using project teams as training grounds for talented fast-trackers,
What angle was red riding hood pulling from the vertical : On her way to visit Grandmother, Red Riding Hood sat down to rest and placed her 1.20-kg basket of goodies beside her. A wolf came along, spotted the basket
Estimate the average force on the jet due to the catapult : You are watching a television show about Navy pilots. The narrator says that when a Navy jet takes off, it accelerates because the engines are at full throttle
What was germosen fixed manufacturing overhead volume : What was Germosen's fixed manufacturing overhead volume variance for the year? Inc. uses a standard cost system with direct labor hours
Hypothetical alien planet with both a gravitational field : This problem involves a hypothetical alien planet with both a gravitational field and an electric field. Long, long ago on a planet far, far away, a physics
How many jars of silver polish must be sold each month : How many jars of silver polish must be sold each month to exactly offset the avoidable fixed costs incurred to produce and sell the polish?
What is the resistance of the wire : A copper wire of cross sectional area A=1.7 mm2 and Lenght L=1 m carries a current of I=6.4 A at the temperature of T1= 20 0C.
Oscillate with a small amplitude : A pendulum with a length of L = (0.712 ± 0.002) m is set to oscillate with a small amplitude. The time of 20 periods is measured as (34.05 ± 0.13) s.

Reviews

Write a Review

Managerial Accounting Questions & Answers

  Manage budgets and financial plans

Explain the budgeting process and its importance to a business, identifying the components of different budgets, forecast estimates for inclusion in the budgets.

  Prepare a retained earnings statement

Prepare a retained earnings statement for the year and Prepare a stockholders' equity section of given case.

  Prepare a master budget for the three-month period

Prepare a master budget for the three-month period.

  Construct the companys direct labor budget

Construct the company's direct labor budget for the upcoming fiscal year, assuming that the direct labor workforce is adjusted each quarter to match the number of hours required to produce the forecasted number of units produced.

  Evaluate the predetermined overhead rate

Evaluate the Predetermined Overhead Rate

  Determine the company''s bid

Determine the company's bid if activity-based costing is used and the bid is based upon full manufacturing cost plus 30 percent.

  Compute the pool rates for the different activities

Complete the schedule to compute the pool rates for the different activities.

  Prepare Company financial statements

Prepare Company financial statements

  Prepare an analysis of terracycles

This individual assignment is based on the TerraCycle Inc.

  Discuss the ethical issues

Discuss the ethical issues

  Political resources in emerging markets

Calculate the GDP in Income Approach  and Expenditure Approach

  Management accounting - ehsan electronics company

A new plant accountant suggested that the company may be able to assign support costs to products more accurately by using an activity based costing system that relies on a separate rate for each manufacturing activity that causes support costs.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd