Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A 100-ft steel tape of cross-sectional area 0.0025 in^2, weight 2.3 lb, and standardized at 68 degrees F is 99.992 ft between end marks when supported throughout under a 12-lb pull. What is the true horizontal length of a recorded distance AB for the conditions given:
Recorded Distance AB(ft)=86.35
Average Temperature(degreesF)=50
Means of Support= Ends only
Tension(lb)=22
A large drainage channel has a trapezoidal cross section with a bottom width of 75 feet and bank side slopes of 4:1 (H:V). If the normal depth of flow is 25 feet, compute the normal flow rate through the channel (Q in cfs).
Determine the normal stress in a soccer ball if the internal pressure is 110 kPa, the outside diameter is 220mm and the wall thickness is 3mm .
How many mL of water will it take to get 10 pounds of dry aggregate to a moisture content of 5%. 1 kg=2.2 pounds
a rectangular reinforced concrete beam carries service loads on a span of 20 ft as shown. use f'c = 3000psi and fy = 60000 psi; b = 14.5 in, h = 26 in, and reinforcing is three number 10 bars.
if a manometer incline at 45 degrees containing a fluid with specific gravity of a 2.0 using it to measure the pressure in a system, and the fluid levels rise 30 inches. What is the pressure in the system in Lbf/In^2 and H2O
You have been asked to design a hoisting system and a demolition catch system for the superstructure of a bridge that you are removing. Discuss in detail the steps you would take in order to be able to provide the necessary information
One second later another ball is thrown vertically from the ground with a velocity of 10m/s. Determine the height from the ground where the two balls pass eachother.
what criteria should Zachary use evaluate the project ?
A river flows towards a lake with a velocity of 3 m/s and rate of 500 m3/s at a location of 90 m above the lake surface. Determine the total power generation potential of the river at that location.
Also calculate the deflection of the beam to check that it complies with the design limit of L/200. Only variable actions are required for deflection check.
A 1 m diameter unfinished concrete pipe (n = 0.015) has a slope of So = 0.001 and conveys water at Q = 0.5 m3/s. Find the normal depth yo and critical depth yc.
A barometer filed with non-toxic glycerin is used to measure standard sea level atmospheric pressure. neglecting the effect vapor pressure and surface tension. calculate the atmospheric pressure head.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd