What is the total head 5.0m below the river bed

Assignment Help Civil Engineering
Reference no: EM13559042

A river is 6 m deep. The riverbed material has a saturated unit weight of 19.5kN/m3. What is the effective vertical stress 12 m below the water surface?

Consider again the scenario above. Assume the water is static. Assume a datum at the water surface.

a) What is the total head 5.0m below the river bed?

b) What is the pore water pressure at that level?

Reference no: EM13559042

Questions Cloud

Determine what is the mass of the aluminum cup : An aluminum cup contains 225 g ofwater and a 40 g copper stirrer, all at 27°C. Calculate the mass of the aluminum cup
Determine the cohesion and the angle of friction of the soil : Undrained shear box tests were carried out on a series of soil specimens with the following results:Total normal stress (kPa) Total shear stress at failure (kPa)
Determine how deep is the dent made in the car : A 30-kg shopping cart full of groceries sitting at the top of a2.0-m hill begins to roll until it hits a stump at the bottom ofthe hill. How deep is the dent made in the car?
Determine the increment of vertical stress there : Constructing the foundation causes changes in the levels of vertical stress at all points in the soil. One such point lies at the centre of the footing plan, and is at a depth of 10 m. Determine the increment of vertical stress there.
What is the total head 5.0m below the river bed : A river is 6 m deep. The riverbed material has a saturated unit weight of 19.5kN/m3. What is the effective vertical stress 12 m below the water surface?
Find the rotational inertia of themerry-go-round : In a playground, there is a small merry-go-round of radius1.20 m and mass 120 kg. Calculate the rotational inertia of themerry-go-round about its axis of rotation
What is the total work that mustbe done by the salmon : A 5.00-N salmon swims 20.0m upstream against a current thatprovides a resistance of 1.50N. What is the total work that mustbe done by the salmon
How large is the bubble when it reachesthe surface : A scuba diver releases a 3.50 cmdiameter (spherical) bubble of air from a depth of 10.0 m in alake. How large is the bubble when it reachesthe surface
Find the maximum kinetic energya photo electron can have : Ultraviolet light of wavelength 218 nm shines on a zinc surface. If the workfunction of zinc is 4.3 ev, what is the maximum kinetic energya photo electron can have

Reviews

Write a Review

Civil Engineering Questions & Answers

  Find the amount of work in foot-pounds required to empty

The vertical cross-section of the trough parallel to an end is shaped like the graph of y=x6 from x=-1 to x=1 . The trough is full of water. Find the amount of work in foot-pounds required to empty the trough by pumping the water over the top.

  Prove that the forces are equal and that the lines of action

this cuts it down to a single force that you have to solve for, regardless of what type of member it is. Prove that the forces are equal and that the lines of action are along an angle theta. HINT: Use to do equations of equilibrium.

  Calculate the stress in a rebar subjected to tensile bar

Calculate the stress in a No. 7 rebar subjected to a tensile load of 10,600 lb (in ksi).

  Determine what is the probability that the system operates

Consider a system that consists of 4 devices. The probabilities of failure for each of the devices are, respectively: 10%, 25%, 20%, and 30%. (a) If these components were in series, what is the probability that the system operates

  Determine the force arm oa exerts on the smooth cylinder

If arm OA rotates with a constant clockwise angular velocity of theta dot(first dirivatie)=1.5 rad/s. determine the force arm OA exerts on the smooth 4-lb cylinder B when theta=45 degrees.

  Calculate pi if sample falls with the control charts limits

A sample with a measured background level (Bi) of 22 mg/l was spiked with the equivalent of 30 mg/l without appreciably changing the sample volume. The result for the spiked sample (Ai) was 49.2 mg/l. Calculate Pi and determine if it falls with th..

  What is future work of the entire cash flow series in year

the cash flow sequence $70+4k, where k is in years and cash flow is in $1000. What is the future work of the entire cash flow series in year 10 at 10% per year

  What is the conversion rate for parts per million by volume

What is the conversion rate for parts per million by volume (ppmv)conversion. How is this converted into atm, Pa, and torr?

  Calculate the critical load for strong-axis buckling

we have the I-section made of steel (E = 29,000 ksi) which is to be used as a column, pinned at the top, and fixed at the base. Bracing is to be added in the direction of the weak buckling axis, at an unknown height, H.

  Explain how to estimate the et losses for the area in 1 year

It the mean annual runoff of a drainage basin of 10000 km^2 is 140 m^3/s, and the average annual precipitation is 105 cm, estimate the ET losses for the area in 1 year. What are your assumptions

  Determine the shear stress 3 inches above the neutral axis

a.) Determine the maximum shear stress in a rectangular beam 6 in. wide and 8 in. deep produced by a shear force of 38,400 lb. b.) For the same section and shear force conditions of part (a) above.

  What is the speed that the observer at a records

Car B is driving straight toward the point O at a constant speed v. An observer, located at A, tracts the car with a radar gun. What is the speed |r(dot)B/A| that the observer at A records

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd