What is the total cost of the project

Assignment Help Civil Engineering
Reference no: EM132416445

Problem: A wall needs to be build using 12 x 4 x 6 inch concrete blocks. The crew needed for this job consists of a team of 3 workers. This team can be hired only on a per day basis at the cost of $400 per day. The crew production rate is 70 blocks per day. To complete  the work they also need some tools. They can rent the tools from Home Depot at the cost of $50 per day. If the cost of each block is $50, what is the total cost of the project? [Use 10% waste factor when purchasing the material.]

Reference no: EM132416445

Questions Cloud

Introduction to civil-environmental engineering : List the ethical issues you observed in Incident at Morales. From your personal perspective, prioritize these ethical issues from most critical
What NIST and FISMA are separately : Discuss in 500 words or more the relationship between NIST and FISMA. This should not be a two part paper explaining what NIST and FISMA are separately.
Discuss the advantages of packet switching : Describe the process of communication between two hosts attached to different networks shown below. Explain it in sub-steps with the help of diagrams.
Who are the leaders of the organization : How do you determine whether an organization is ethical or not? Who are the leaders of the organization?
What is the total cost of the project : If the cost of each block is $50, what is the total cost of the project? [Use 10% waste factor when purchasing the material.]
What real world job experience should a CIO have : What real world job experience should a CIO have?
Impact of an increase in gasoline prices : Estimate the likely impact of an increase in gasoline prices from $1.30 to $1.50. Solve this problem using three alternative measures of elasticity.
Many organizations lack clear and concise security policy : Many organizations lack a clear and concise security policy. Without a policy there is often an inconsistency in security focus by employees and management
Determine the surface concentration : The diffusion coefficient of A in B corresponding to the reaction conditions is 3.84 x 10-11m2/s. Determine the surface concentration Cs.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd