Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A single metallic crystal is oriented such that the normal to the slip plane and the slip directions are at angles of 50 and 40 degrees respectively, with the tensile axis. If the dislocations in the plane start moving when the resolved shear stress is 6.2 MPa, what is the tensile stress at which yielding occurs?
The testing machin that covers the right range of load is to be chosen. it is expected to load the material up to a strains of 3%. if th material must remain elastic over that range, what would be the maximum load
Under the right conditions, it is possible, due to surface tension, to have metal objects float on water. Consider placing a short length of a small diameter steel (sp. wt. =460 lb/ft^3) rod on a surface of water.
(a) determine if the flow will choke and both the downstream and upstream water depths. (b) if there is also a 1 ft high step up in bottom elevation at the contraction, determine if the flow will choke and both the downstream and upstream water de..
Determine the maximum rimpull of the tractor in each of the indicated gears if the efficiency is 92%. If the tractor is operated over a haul road whose slope is +2.5% with rolling resistance of 80 lb/ton
The acceleration of a particle along a straight line is defined by a=(2t-9)m/s^2, where t is in seconds.At t=0, s=1m, and v=10 m/s. When t=9s, determine the particles position, the total distance traveled, and the velocity.
Compute the magnitues of all the forces acting on member CDE of the frame. There are pins at C D and E and an 80 kelp force on the right. Length measurements are in ft.
A wastewater is discharged to a stream with a reoxygenation constant of 0.5 day-1 and a velocity of 1 m/sec. The oxygen saturation concentration in the stream is 11 mg/L.
Water flows uniformly at a depth of y1 = 40 cm in the rectangular troweled concrete channel shown, which is 10 m wide and has a bed slope of So = 0.040 . What is the velocity in the channel before the hydraulic jump
determine the horizontal spacing of the vertical drains if the drains are installed in triangular grid to reach 90% of primary consolidation in 1.5 years after the commencement of fill placement
The company can either buy a single 200m^3 ideal plug flow tank, or three 80m^3 completely mixed tanks that operate in series. the cost is essentially the same. The pollutant is removed as a part of a first order reaction with a rate constant value..
A water treatment plant effluent is to be disinfected with chlorine from ton cylinders of compressed gas. The plant is 5 million gallons per day. There are a total of 10 useable cylinders in the plant.
a prismatic bar AB of length L, cross section A, modulus of elasticity E, and weight W hangs vertical under its own weight. if the bar is a riser pipe hanging from a drill rig at sea, what is the total elongation of the pipe
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd