Yahoo Widgets, Inc. (YWI) is a widget manufacturer in Williamsburg, Virginia. YWI receives raw material sheets of plastic from Tribe Plastics, once per week, on Monday, for the family of widget models it produces. These widgets are then shipped to another manufacturer, Acme Gadgets, Inc. (AGI), for inclusion in its family of gadgets, which are sold to end users. For its new product line, the gadget manufacturer requires two types of widgets, large and small, that are packaged in returnable trays holding 55 widgets for shipment. The trays are returned, empty, to YWI after the widgets are used by AGI. The manufacturing process consists of a thermoforming activity that transforms the sheets of plastic into a "rough" widget, which requires a drilling process step and a grinding and sanding process step before the packing and shipping process step. These steps and related information are shown in the following table.

Process Characteristics

Average Demand: 5000 per day, 3500 large, 1500 small Batch size: 1100

Number of shifts per day 2

Shift 8 hours with 30 minute lunch

Process Step 1

Thermo-form

Cycle time = 15 seconds

Set-up tine =15 minties

Up time= 85%

Operators = 2

Every part every week

WIP = 5 days of sheets n front of Thermo-forming machine

Process Step 2

Drill

Cycle time = 32 seconds

Set-up tine = 25 minutes Up trne= 80%

Operators = 4

Every Part every week

WIP = 1250 large, 1500 small

Process Step 3

Orin, Sand

Cycle time = 22 seconds

Set-up time = 27 minutes

Up time= 75% Operators = 5 Every part every week

WIP = 1750 large, 1250 smell

Process Step 4

Pack and Sly

WIP = 750 large, 125 sma

Shipments

One shipment of 5000 per day

Information Flow

Electronic commtrication of forecasts to supplier

Electronic communication of daly orders from customer

Electronic communication of forecasts from customer

Electronic cornmunicabon of daly slipping schedule to process step 4 Electronic cornrnunicabon of weekly schedule to process steps 1-3.

All materiel is notched

1. Using the data shown in the table above, construct a value stream map for Yahoo Widgets, Inc.

2. What is the takt time of the manufacturing cell?

3. What is the production lead time for each process step?

4. What is the total processing time for the manufacturing cell?

5. What is the total capacity of the manufacturing cell?

Requirements
USE VSM Template
- Show

o Critical thinking

o Original thinking
- Use direct quotations sparingly and judiciously
- Properly identify any sources and integrate into own thoughts and ideas
- Provide a straightforward, easy-to-follow arrangement with appropriate formatting:

o Comply with APA format
- Create an Excel document assignment"
- 300 words Answer 2-5 short intro/short conclusion on value stream provide link to sources

Attachment:- VSM Template.rar

Reference no: EM131396803

Questions Cloud

Form a polynomial : Form a polynomial f(x) with real coefficients of degree 4 and the zeros 2i and -5i.
Missed alarms and 40 million stolen credit card numbers : Determine the fundamental challenges that organizations face in general in regard to protecting organizational assets and information.Specify the red flag(s) that Target overlooked or ignored before the retail attack and give your opinion as to w..
Which topics are targeted toward this age group : Compare the content. Which groups and forums are present? What are the members' interests? Which topics are targeted toward this age group? Summarize the information you read and viewed.
Potential rational zeros of the polynomial function : List the potential rational zeros of the polynomial function f(x) = x5 - 6x2 + 5x + 15. Do not find the zeros.
What is the takt time of the manufacturing cell : What is the takt time of the manufacturing cell and what is the production lead time for each process step - what is the total processing time for the manufacturing cell?
Use the ribbon instead of toolbars and menus : Read the article titled "Use the Ribbon instead of toolbars and menus." Next, indicate whether or not you believe the ribbon, introduced in Office 2007 and still used in Office 2013, increases the efficiency for users. Then, determine whether or n..
How are enterprises incorporating creative thinking : How are enterprises incorporating creative thinking? Which mind mapping and brainstorming resources are listed? Which creativity software and books are promoted? Summarize the information you read and viewed.
Leader innovative proposal results in failure : If a leader's innovative proposal results in failure, the most unfavorable evaluation of the leader will occur when the group believes: the leader exercised poor judgment in making such a radical proposal
Give a confidence interval for the mean bleeding time : Give a 95% confidence interval for the mean bleeding time under pressure for the six persons and draw some conclusion as to whether pressure increases bleeding time.

Reviews

len1396803

2/17/2017 12:40:39 AM

Hello I have a couple questions about the M6 individual assignment.. I do not understand how to calculate the timeline bar at the bottom of the VSM and there is no explanation for this in the class materials. Assuming that we are doing the VSM for a single item: The value added time is the cycle time for the process step. The non-value added time is the time between the end of production in one process step and the start of the next process step divided by the batch size. Lead time is defined as the time between the order and delivery for a process or set of processes. Lead time for all the process steps is all the numbers in the saw tooth added together. For Production Lead Time for Each Process Step. how do we calculate that? It would be the sum of the value added time and non value added time for that process step.

len1396803

2/17/2017 12:40:25 AM

• What does WIP stand for? (work in progress?) • When calculating production time. should we assume that each operator is not dependent on another operator within that task area? For example, there are two operators in step 1. would I calculate production time then multiple by two or divide by two ? • What does Every Part Every Week mean in the step? • Do you have any sources for calculating production time below each of the data boxes? I cannot find any examples in the book or on the books website. • What does WIP stand for? (work in progress?) • When calculating production time. should we assume that each operator is not dependent on another operator within that task area? For example, there are two operators in step 1. would I calculate production time then multiple by two or divide by two ? • What does Every Part Every Week mean in the step? • Do you have any sources for calculating production time below each of the data boxes? I cannot find any examples in the book or on the books website.

len1396803

2/17/2017 12:39:24 AM

There is a case scenario with a table with the specific data and in this assignment you have to answer the following questions: 1. Using the data shown in the table above. construct a value stream map for yahoo Widgets. Inc. 2. What is the takt time of the manufacturing cell? 3. What is the production lead time for each process step? 4. What is the total processing time for the manufacturing cell? 5. What is the total capacity of the manufacturing cell? Here is a good reference on cycle time - takt time and lead time

len1396803

2/17/2017 12:39:11 AM

MI would issue orders to Tribe Plastics. This is the supplier step. It doesn't change the calculations. but dots help complete the VSM. These are steps to create a VSM - although you may also use the Excel template in the classroom 1. Begin with symbols for customer, supplier. and production to ensure the big picture 2. Enter customer order requirements 3. Calculate the daily production requirements 4. Enter the outbound shipping requirement and delivery frequency 5. Determine inbound shipping method and delivery frequency 6. Add the process steps (i.c machine. assemble) in sequence. left to right 7. Add communication methods. add their frequency. and shoe the direction with arrows 8. Add inventory quantities between every step of the entire flow 9. Determine total working time (value added time) and delay (non•value added time)

len1396803

2/17/2017 12:39:06 AM

Additionally. I am having trouble figuring out how Tribe Plastics comes into the model. Since YWI receives raw material sheets of plastic from Tribe Plastics. once per week. would they receive demand information from YWI or the customer? Would this company come before the supplier step? Or would production control communicate the requirement to them daily. and they deliver weekly? I do not understand how this factors into the calculations either.

len1396803

2/17/2017 12:38:41 AM

1. The data I have given you should be sufficient for the VSM. 2. No process improvements are required. 3. Yes. similar to Exhibit 12.2 4. Takt time is the available production time divided by customer demand. For example. if a widget factory operates 480 minutes per day and customers demand 240 widgets per day. takt time is two minutes. 5. Lead time is the amount of time that elapses between when a process starts and when it is completed. 6. Total processing time would be the production quantity needed • the cycle time. 7. Capacity would be the number they could produce in a day. usually the slowest process puts an upper bound on the total capacity.

len1396803

2/17/2017 12:38:03 AM

Requirement attached with explanation requirement and supporting docs Q&A.The Value Stream Mapping template is attached. Here are some Questions and Answers past students have had about the assignment: I am working on this week's individual assignment and want to ensure I am understanding it correctly. You ask us to develop a value stream map for Yahoo Widgets. Inc. 1. Are we supposed to use only the data that you have given us? 2. Do we have to identify where process improvements can be made? 3. So this should be based off of exhibit 12.2 in the book? 4. Identify the current takt time. 5. Production lead time for each process step. 6. Total processing time for the manufacturing cell. 7. Total capacity of the manufacturing cell?

Write a Review

Operation Management Questions & Answers

  The additional of a new and improved pulsating blender

The pointer appliance company is investigating the additional of a new and improved pulsating blender to its line of consumer appliances. the product chops, grinds, grates, and blends smoothies twice as fast as all other blenders on the market. it ha..

  Utilize the integrated software solutions

SAP can utilize the integrated software solutions it currently maintains and build off of those. “We’re seeing a convergence of technologies, including RFID, 2D bar codes, voice, GPS and sensors,” says Mike Liard, director of the RFID practice for VD..

  Supply chain management describe manufacturing and services

Supply chain management describe manufacturing and services (example include for both). What do you think of the power and influence assessment? How will it affect your actual work activities and interactions? Briefly explain theory of constraints an..

  Describe how value chain helps companies create and build

primary task response within the discussion board area write 400-600 words that respond to the following questions with

  What are poka-yoke devices

What are poka-yoke devices?- originality of design- description of your designs with terms used in poka-yoke design.

  Unsuccessfully attempted to resolve conflict

Think of a time you unsuccessfully attempted to resolve conflict. With respect to the five interpersonal conflict handling styles (Forcing, collaborating, Compromising, avoiding and accommodating), can you attribute your lack of success to your use o..

  Consider the two auto manufacturing plants

Consider the two auto manufacturing plants below: How much is the annual output of each plant? How much is the flow time in each plant? How much is the WIP inventory in each plant?

  What are the functions of assimilation-accommodation

For this reflection activity, pick five of the following seven questions to respond to with examples for each. These are foundational concepts that will help you be successful in this course. What is the relationship between careful observation and c..

  Absent in the service scheduling hierarchy

Which of the following is present in the manufacturing scheduling hierarchy but is absent in the service scheduling hierarchy?

  Relationship between the organization and its suppliers

The relationship between the organization and its suppliers or its customers is key in making decisions regarding locating a plant or facility. Such decisions are generally a strategic decision.

  Changes on output-consumption-interest rate and investment

If the economy were at a steady-state unemployment rate with a separation rate of 0.02 per month and a job-finding rate of 0.10 per month, and the labor force was 100 million, how many individuals would lose their jobs each month? In a closed classic..

  How a u.s. company that has fallen victim

Make a recommendation on how a U.S. company that has fallen victim to this Chinese practice should respond so as to protect its intellectual property.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd