What is the probability that both rain and lightning occur

Assignment Help Civil Engineering
Reference no: EM13552808

1.Let event Y be a rainstorm on a given day and event X be lightning on a given day. Let probability of these events be: P(X)=0.3 P(Y)=0.1 P(Y|X)=0.5 What is the probability that both rain and lightning occur on a given day?

2.A concentrated load of 200 kips is applied to the ground surface. What is the vertical stress increment due to the load at a point 15 ft below the ground surface at a horizontal distance of 10 ft from the line of the concentrated load?

3.A 12 ft x 12 ft square area carrying a uniform load of 5000 lb/ft^2 s applied to the ground surface.Find the vertical stress increment due to the load at a depth of 25 ft below the center of the loaded area.

Reference no: EM13552808

Questions Cloud

Prepare the adjusting journal entry : Prepare the adjusting journal entry to correctly report the balance of the Supplies account and the SuppliesExpense accountas of December 31, 2013.
Prepare consolidation workpapers for pan corporation : Prepare consolidation workpapers for Pan Corporation and Subsidiary for the year ended December 31, 2011.
What is the acceleration at given time : A mass is oscillating on a spring with a period of 4.6s. At t=0s the mass has zero speed and its x = 8.3 cm. What is the acceleration at t=2.5s
Effect and incentive of franchises to maintain quality : Why would a chain such as Marriott tend to own its hotels in resort areas, such as national parks, where there is little repeat business and franchise hotels in down-town areas, where there is a lot of repeat business? Thinks of the reputation ..
What is the probability that both rain and lightning occur : A 12 ft x 12 ft square area carrying a uniform load of 5000 lb/ft^2 s applied to the ground surface.Find the vertical stress increment due to the load at a depth of 25 ft below the center of the loaded area.
Estimate the amplitude of vibration : A 0.5kg mass is attached to a spring of spring constant 20N/m along a horizontal frictionless surface. what is amplitude of vibration
Process costing system for normal operations : Can Ludwig use a job-order costing system to account for the costs associated with the special order even though it uses a process costing system for its normal operations?
Find what time interval elapsed between the events : Keilah, in reference frame S, measures two events to be simultaneous. Event A occurs at the point (53.0 m, 0, 0) at the instant 9:00:00 Universal time on January 15, 2010. find What time interval elapsed between the events
Determine the focal length of this compound lens : You combine two thin lenses by placing them in contact so that their axes coincide, forming what is called a compound lens. Find the focal length of this compound lens

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the distance the orbiter travels from the time t

A 230,000-lb space shuttle orbiter touches down at about 220 miles per hour (mph). At 200 mph, its drag parachute is deploys. The wheel brakes are applied at 100 mph until wheel sotp and the drag parachute is jettisoned from the orbiter at 35 mph.

  Find summer values for oxygen tranfer-hp and airflow rate

A fine-bubble aeration basin has a flow of 21.5 mgd, an influent BOD of 180 mg/l, 31 mg/l of mmonia, and effluent of 10 mg/l. During the winter, the wastewater temperature of 14.8 degrees C does not nitrify.

  Determine true coefficient of discharge in the weir equation

A rectangular channel carries a discharge of 2.00 m3/sec per meter of channel width over a weir crest that is 1.4 m in height. The energy grade line upstream of the weir measure 2.7 m above the channel bottom

  Volume of the lake

Suppose that the distance from the lake outlet to the withdrawal cannot be more than 20 mi. What should be the new volume of the lake?

  Calculate stress along edge a-b caused by prestressing force

A horizontal pre-stressing force of 750kn is applied to a rectangular concrete beam to be used as a structural member of a traffic bridge. The beam has a depth of 500mm and a width of 250mm. The force is applied at a distance of 80mm below the sec..

  What removal percentage should be expected for particles

A treatment plant has a horizontal flow sedimentation tank with a depth of 4m, width of 6m, length of 36m, and process flow rate of 450m3/h. What removal percentage should be expected for particles that have settling velocities of 1.0 m/h and 2.5 ..

  How to design a horizontal curve for a two-lane road

design a horizontal curve for a two-lane road. The road has 12-ft. lanes. Due to expansive excavation, it is determined that a maximum of 34 ft. can be cleared from the road's centerline toward the inside lane to provide for stopping sight distanc..

  Calculate the magnitude and direction of horizontal force

calculate the magnitude and direction of the horizontal force exerted on the contraction (not on the water). Assume that there is no loss of energy in the contraction. Use the gamma of water is equal to 1000 kg/m^3

  Determine the minimum diameter a steel wire can have

If the elastic limit of steel is 5.0 10^8 Pa, determine the minimum diameter a steel wire can have if it is to support a 69-kg circus performer without its elastic limit being exceeded.

  Find an expression for the pressure gradient in x-direction

A frictionless, incompressible steady flow field is given by V=2xyi-y^2j in arbitrary units. Let the density be ρ_0=constant and neglect gravity. Find an expression for the pressure gradient in the xdirection.

  Determine what is the balance delay for the solution

A proposal has been submitted to replace a group of assembly workers, each working individually, with an assembly line. The following table gives the individual work elements. The demand rate for this job is 1600 units/week (assume 40h/week)

  Determine cunningham correction factor at standard condition

For a .15 micrometer diameter spherical particle (density of particle = 2500 kg/cubic meter) determine the Cunningham correction factor at standard conditions.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd