You are working as a project analyst for the local gas utility, and you have been placed on a project to install an 11,000 foot segment of gas transmission line. The initial schedule called for 500 feet of pipeline to be installed each week, with the total construction cost projected to be $25 million. After 8 weeks, 4750' of pipeline has been installed at a cost of $11.25 million.
a. What is the original estimated duration of the project?b. What is the expected duration given productivity experienced? What is the earned value after 8 weeks?c. Is the project over or under budget after 8 weeks? By how much?d. Is the project ahead or behind schedule? By how much relative to the original schedule?e. What is the forecast final cost of the project?
The telescope of the instrument is 5.25 ft above the ground station, whose elevation is 415.65 ft. What is the elevation of the tip of the spire? (Ignore atmospheric refraction and earth curvature)
Traction and Total Resistance, Would you please help me with the following question: A 90 tonne rear dump truck travels on an 8% grade loose gravel road.
An engineering student is driving on a level roadway and sees a construction sign 180 m ahead in the middle of the roadway. The student strikes the sign at 56 kph. If the student was traveling at 90 kph when the sign was first spotted, what was th..
how to calculate the principle of shoring system in formwork analysis when the secondly floor upper has been poured ?
A vertical triangular orifice in the wall of a reservoir has a base 0.9m long,0.6m below its vertex and 1.2 m below the water surface. determine the theoretical discharge?
Determine the magnitudes of the additional loads that must be applied at B and F if the resultant of all six loads is to pass through the center of the mat.
What is the ratio of the magnitude of E2 to the magnitude of E1? You may neglect the effects of gravity on the proton.
Knowing that these forces are equivalent to a force-couple system at C consisting of the force C= (- 8 N)i+ (4 N)k and the couple Mc =(360 N ⋅ m)i, determine the forces applied at A and B when Az = 2 N.
two links AB and DE are connected by a bell crank as shown. Determine the maximum force that can be safely exerted by link AB on the bell crank if the maximum allowable value for the reaction at C is 1600N.
What is your recommendation for the maximum size of coarse aggregate for the following situation? A continuously reinforced concrete pavement cross section contains a layer of No. 6 reinforced bars at 15.24 cm centers,
(a) Use differentiation to find a general expression for the rocket's velocity as a function of time, (b) When is the velocity zero?
The total dissolved inorganic carbon (TIC) of a sample of groundwater is 8.33 mM. The temperature of the aquifer is 15C, the pH is 7.5, and the ionic strength is 0.05 M. What is the H2CO3, HCO3-, CO3 2-, and the partial pressure of CO2? [Use activ..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd