What is the maximum price per ton the company

Assignment Help Civil Engineering
Reference no: EM13562663

A company uses a 50% solution of NaOH to maintain the pH of water circulated in one of its furnace exhaust scrubbers.  The cost of the solution is $200 per ton f.o.b. (free-on-board).  The supplier says it would prefer to sell the company a 65% NaOH solution and the company says the water content is immaterial as long as the equivalent costs are the same including freight.  If the freight is $15 per ton, what is the maximum price per ton the company should pay for the 65% solution?

Reference no: EM13562663

Questions Cloud

Find the height and the width of the triangular soil bank : A ditch having a cross-sectional area of 50 square feet is being excavated in common earth. The soil’s angle of repose is 35° and its swell is 25%. Find the height and the width of the triangular soil bank that will result from the trench excavation
What is the volume of the required soil excavated : Soil is excavated from a borrow to construct an embankment with a net volume of 50,000 cy. This is performed by compacting 12-in layers of the soil to a dry weight of 110 pcf at a moisture content of 18%.
What is the pulling force in lbs to be applied for one of : Two steel plates were constructed in warm weather. Due to temperature change, a 1/32" hole mismatching occurred. What is the pulling force, in lbs, to be applied for one of the plates to match the two holes The plate length is 3 ft (from the left end..
What would be the minimum number of truckloads required : Soil is excavated from a borrow to construct an embankment with a net volume of 50,000 cy with 95% of Modified Proctor maximum dry density of 110 pcf with a Modified Proctor optimum water content of 8%.
What is the maximum price per ton the company : A company uses a 50% solution of NaOH to maintain the pH of water circulated in one of its furnace exhaust scrubbers.  The cost of the solution is $200 per ton f.o.b. (free-on-board).
In which water is sprayed directly into the exhaust duct : The exhaust from a rotary kiln hazardous waste incinerator must be cooled from 1200 degrees C to 300 degrees C before entering a spray dryer for acid gas removal.
How far in advance of the curve must the sign be located : Drivers must slow down from 65 miles per hour to 55 miles per hour to negotiate a severe curve on a rural highway.  A warning sign for the curve is clearly visible for a distance of 110 feet.
Determine in the rate of carbon 14 : In dating using radiocarbon, the amount of C^14 remaining at the time of measurement is expresed as a percentage of modern carbon.  For example that the 30% modern carbon
Determine the modulus of elasticity of concrete by the aci : Determine the Modulus of Elasticity of Concrete by the ACI formula for a concrete cylinder that has a unit weight of 120pcf (1920kg/m^3) and a compressive strength of 3000 psi (21MPa).

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate the inner diameter if you are designing for a max

Assume 0.1 kg of air initially at 200 kPa and 300 K undergoes an isothermal compression process to a volume of 0.02 m3. Find the work done in the process and the final pressure. Sketch the process on a P-V diagram.

  Determine the specific weight of the wood

A solid wooden cube (.5*.5*.5 m^3) is floating in water and 0.2 of the cube extends above the water surface. Determine the specific weight of the wood.

  Detrermine magnitude and location of resultant fluil force

the tank contains water to depth of 2m and oil (sg=.8) on top of the water to a depth of 1m detrermine the magnitude and location of the resultant fluild force acting on one end of the tank

  The corresponding increase in the diameter of the vessel

A spherical gas container having an outer diameter of 15 ftand a wall thickness of 0.90 in. is made of a steel for whichE =29*106 psi and v = 0.29. Knowingthat the gage

  Estimate the tension in the rope if the wind

The intensity of Na light passing through a gold film wasmeasured to be about 15% of the incoming light. What is thethickness of the gold film? ( λ=589 nm; k=3.2).

  Determine the acceleration of the rod

A rectangle commercial building must be laid out 200.00 ft wide and 300.00 ft long. if the steel tape used is 100.02 ft long under standard conditions, what distances would be laid out?.

  What is the temperature of the vapor exiting the valve in c

Ammonia vapor flows through a valve. It enters the valve at a pressure of 8 bar and a temperature of 120C and after going through a throttling process it exits at a pressure of 3.5 bar.

  Determine the flow area

A rectangular concrete channel is 3 m wide and 2 m high. The water 20 deg Celsius in the main channel is 1.5 m deep and is flowing at a rate of 30 m^3/s. determine the flow area, wetted perimeter, and hydraulic radius. is the flow laminar or turbu..

  What is the difference in temperature form standard

A driver on a leveltwo-lane highway observes a truck completely blocking thehighway.The driver was able to stop her vehicle only 20 ft. fromthe truck. If the driver was driving at 60mph, how far was she fromthe truck when she first observed it?

  Determine the concentration of acetone in the river due to

You are an environmental scientist who has been hired to assess the damge caused by an accident in which an eyeglass lens manufacturer, located on a river, released acetone directly into the water. Fortunately, only one 5.0-L bottle was released. The..

  What input of power rating is required for pump to refill

A water storage tank located on a larege dairy farm has a storage capacity of 0.1 ML. The average rate of water consumption from this tank is 6.25 kL per day, every day. The farmer refills the tank (overnight) every 14 days

  What is shear force exerted by oil on m long section of pipe

the flow profile is such that u=u(max)*(1-(r/R)^2) where u is the flow speed and r is the distance from the centre of the pipe in the radial direction. What is the shear stress on the pipe wall What is the shear force exerted by the oil on a 1m lo..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd