Matt is building a stand made out of mud bricks ( ultimatecompressive strength approximately 100 psi and density 250lbs/cubit foot) in the shape of a tent (triangular sides, verticalfront and back). The footprint of the building is 60ft x 60 ft. Thetriangle building height is 60ft. What is the largest rectangularinterior room that can be built (length x width x height). Assume that length = width and the minimum height is 10 ft and that thefront and rear of the room is flush with the front and rear of thebuilding. (people will be standing inside the room).

Reference no: EM13540150

Questions Cloud

A cantilever beam is additionally supported using : A cantilever beam is additionally supported using two tierods. Both rods attach to the end of the beam. One rod comes off at 45 degrees and attaches
Determine the ratio of the weight of the solid shaft : Two shafts are made of the same material and are of equal lengths.one of them is solid and another one is hollow. the ratio ofinside and outside diameters for hollow shaft is 0.65. They are subjected to the same torque and same maximum shearstress. D..
Compare this path line with the streamline through the same : Consider a velocity field V = axiˆ + by(1+ ct) ˆj , where a=b=2 sec-1, and c=0.4sec-1. For the particle that passes through the point (x,y)=(1,1) at the instant t=0, plot the pathline during the interval from t=0 to 1.5 sec.
Determine the magnitude and direction of the shear stress : Crude oil, with specific gravity SG=0.85 and viscosityμ = 2.15×10−3 lbf sec/ft2, flows steadily down a surfaceinclined θ = 30 degrees below the horizontal in a film ofthickness h=0.125 in. The velocity profile is given by u =ρg/μ(hy − y2/2)sinθ
What is the largest rectangular interior room that can be : Matt is building a stand made out of mud bricks ( ultimatecompressive strength approximately 100 psi and density 250lbs/cubit foot) in the shape of a tent
What do they estimate thhe acceleration due to gravity to be : In an experiment to estimate the acceleration due to gravity,a student drops a ball at a distance of 1m above the floor. His labpartner measures the time it takes to fall and obtains an estimateof 0.46s.
How long does it take to reach an altitude of 3000m : Missiles designed for defense against ballistic missiles haveattained accelerations in excess of 100g's or 100 times theacceleration due to gravity. Suppose that the missile
How many hours should it take an articulated wheel loader : How many hours should it take an articulated wheel loader equipped with a 4 yd bucket to load 3000 cu yd of gravel from a stockpike into rail cars
What will be the discharge : A concrete sewer pipe 1m in diameter is laid so it has a drop in elevation of 30cm per 300m of length. If sewage (assume the properties are the same as those of water) flows at a depth of 50cm in the pipe, what will be the discharge?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine what is the maximum height the water can reach

A fireman reduces the exit area on a nozzle so that the velocity inside the hose is quite small relative to the exiting velocity. What is the maximum exiting velocity and what is the maximum height the water can reach

  Determine station of point where superelevation runoff begin

The station of the PC is 20+00. Determine the station of the point where th superelevation runoff begins, the station whe the tangent runoff begins and the station where the curve is fully superelevated if the design superelevation is 6%

  Determine the increase in the temperature of the river

A power plant operates at steady-state. It receives energy from a hot source (combustion of fuel) at a temperature of 420 oC. The plant discharges this energy to a nearby river that acts as a cold source.

  Estimate the flow rate when draw down at the well

A fully penetrating well of 30 cm diameter in an unconfined aquifer of saturated thickness 50 m was found to give the following draw down - discharge relationship under equillibium condition.

  Determine m and b

The following points are taken from data that is known to be of the form y = bx^m

  Determine the fine grains of low plasticity

Soil A is micaceous with an average grain relative density of 2.80, and has a high plasticity in its fine fraction. The ground quartz-feldspathic B is, with an average relative density of 2.65 and fine grains of low plasticity.

  Determine the reactions at supports in four different ways

A force P is applied to bent rod ABC, which may be supported in four different ways. In each case, if possible, determine the reactions at the supports.

  Determine the specific entropy generation in a light bulb

Argon in a light bulb is at 110kPa, 70 degrees celsius. The light is turned off, so the argon cools to the ambient 20 degrees celsius. Disregard the glass and any other mass and find the specific entropy generation

  Determine the total length-depth of the pile

Using a safety factor of 2.00 and neglecting the pile dead weight, find the length of a 1' diameter circular concrete pile required to take a design load of 50 kips in a soil composed of two layers.

  Calculate in ppb the concentrations of mbte in the reservoir

An oil-storage area was abandoned 18 years ago. Oil spilled on the ground had saturated the soil at a concentration of 400mg/Kg of soil. A fast food chain now wants to build a restaurant at the site, and samples the soil for contaminant

  How to label turing points numerically starting with tp1

A differential leveling loop started and closed on BM Juno, elevation 5194.02 ft. The BS and FS distancces were kept approximately equal. Readings (in ft) listed in the order takken are 9.65, 2.11, 2.51, 8.35, 2.06, 9.25, 7.93, 2.83, 5.05, and 4.6..

  How do i solve this problem a 14 in diameter rod must be

how do i solve this problem a 14 in diameter rod must be machined on a lathe to a smaller diameter for use as a

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd