What is the Hydraulic Radius of a rectangular channel that has a bottom width of 5 feet and a flow depth is 3.5 feet. Assume the bed slope is 1.5%, and the Manning's roughness coefficient is 0.013.
What kind of soil labs are good for the construction which is underlying the wet clay is dense sand. For example, compaction, and so on.
The acceleration of a particle along a straight line is defined by a=(2t-9)m/s^2, where t is in seconds.At t=0, s=1m, and v=10 m/s. When t=9s, determine the particles position, the total distance traveled, and the velocity.
A fireworks shell is launched vertically from point A with speed sufficient to reach a maximum altitude of 500ft. A steady horizontal wind causes a constant horizontal acceleration of 0.5ft/sec^2, but does not affect the vertical motion.
the t-component of the force f is known to be 75n. determine the n-component and the magnitude of f.
determine the stations and elevations of the PVCs, PVIs and PVTs of the two vertical curves required to connect the highway segments, as well as the length of the constant grade section (connecting grade is to be small as possible).
determine the rate of discharge through the gate; b) determine the critical depth , yc at the minimum energy, Es,min; c) determine the critical depth, yc at the current flow; d) determine the alternate depth; e) determine the flow regime (sub- or ..
A structural steel beam is attached to a column with bolts. The downward force on the connection is 150 kips. What bolt sizes must be used if the allowable shear stress is 25.0 ksi
A 4 mgd water treatment planet is being designed for an overflow rate of 0.5 gpm/ft^2. If two circular sedimentation basins will be used at al times, what should be the diameter of each basin
If the pipe lengths ar L1 = 3000ft, L2 = 2200, and L3 = 1600 ft the respective pipe diameters are 15,10, and 18in, and the surface water elevations of two of the three reservoirs are A = 125ft and B = 55ft, find the surface water elevation of Rese..
if the settling velocity of a particle is 2.80 mm/s and the overflow rate of an up flow clarifier is 0.560 cm/s, what percent of the particles are retained in the clarifier. If the flow rate of this problem is doubled
The coordinates for Point A, Point B and Point C are 5859.28N, 9331.56E and 8501.95N, 7911.60E and 10,500.00N, 8000.00E respectively. An angle right of 220°31'00" is turned when the backsight is B
An agronomist wants to measure the rainfall at the centroid of a plowed field between two roads. What are the coordinates of the point where the rain gauge should be placed?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd