What is the forward price of the bond underlying the option

Assignment Help Civil Engineering
Reference no: EM131409891

Consider a four-year European call option on a bond that will mature in five years. The five-year bond price is $105, the price of a four-year bond with the same coupon as the five-year bond is $102, the strike price of the option is $100, the four-.year risk-free interest rate is 10% per annum (continuously compounded), and the volatility of the forward price of the bond underlying the option is 2% per annum. What is the present value of the principal in the four-year bond7What is the present value of the coupons in the four-year bond? What is the forward price of the bond underlying the option? What is the value of the option?

Reference no: EM131409891

Questions Cloud

How many newspapers should be stocked : A newsstand manager must decide how many daily papers to stock. - If the manager wants to maximize his expected profit, how many newspapers should be stocked?
Discuss gdds current business status in terms of leadership : Discuss GDD's current business status in terms of each of the leadership challenges. Be specific in evaluating the status against each challenge.
Develop a strategic business plan for a new venture : MBA685 - Strategic Management and Develop a Strategic Business Plan for a New Venture and administrative officer at the corporate level of an offshore organization and, you are assigned to develop a strategic business plan for a new venture in a se..
Alignment of organization culture to implementation : A manager is looking forward to improve the structure on the company. As a result he is concerned with the alignment of organization culture to implementation of the project. How can it be managed please help.
What is the forward price of the bond underlying the option : What is the present value of the coupons in the four-year bond? What is the forward price of the bond underlying the option? What is the value of the option?
Calculate the mean absolute deviation : Calculate the mean absolute deviation (MAD) for the fit of the forecast values to the actual values, then use the equation to forecast the CPI for 2005.
Prepare a full report for bill and john : You are required to prepare a full report for Bill and John by outlining the process and the risks (potential and real) of which Bill and John should be aware
Convert each indexes so that the new base period be 1997 : Convert each of the following indexes so that the new base period will be 1997.
Improve the structure on the company : A manager is looking forward to improve the structure on the company. As a result he is concerned with the alignment of organization culture to implementation of the project. How can it be managed please help.

Reviews

Write a Review

Civil Engineering Questions & Answers

  What is the equivalent grid azimuth for the line

If the geodetic azimuth of a line is 205°06'36.2", the convergence angle is -0°42'26.1" and the arc-to-chord correction is +0.8", what is the equivalent grid azimuth for the line?

  Determine the estimated cost of a similar process unit

The cost of a 620 ft3/hr process unit is $920,000. From historical cost records, the capacity ratio exponent of a process unit is 0.5. Use the capacity ratios raised to an exponent method to determine the estimated cost of a similar process unit with..

  What is the airflow rate needed to maintain the skirts

A design for a hovercraft is made. A fan sends air in from the top of the rectangular chamber (60F) and is exhausted between skirts and the ground. Pressure in the chamber is responsible for lift, and the craft is 15 by 7 ft.

  Determine the equation for distribution of shear strength

(Hint: Try a circular failure surface, determine the equation for the distribution of shear strength with depth, and integrate the shear strength over the radius to find the shear force.)

  Discuss in detail steps would take in order to provide info

You have been asked to design a hoisting system and a demolition catch system for the superstructure of a bridge that you are removing. Discuss in detail the steps you would take in order to be able to provide the necessary information

  What is the allowable minimum length of the ramp

Using the ADA code, what is the allowable minimum length of the ramp base if base if it is 2 ft high and the code is 1:12

  The ratio of volumetric strain to diametral strain is

A w24x192 of a242 steel is to be used as a beam. what are the values of yield stress Fy ultimate tensile stees Fu and modulus of elasticity E for this beam?

  Determine the moment mb exerted by arm ab on arm bc

The mass of arm BC is 4 kg, and the arm may be treated as a uniform slender rod.

  What would scientist expect the barometer reading to be

A scientist plans to build a water barometer. When the atmospheric pressure is 990 mb abs and the water temperature is 70 degrees Celsius, what would you expect the barometer reading (water rise) to be

  Estimate the time it takes to bring the water

estimate the time it takes to bring the water to 50?C. Make enough simplifying assumptions so that you can solve the problem mathematically, that is find a formula for T(t).

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design guidelines and drawings. Your report should include the following:I. Data required for the design II. Types of constructed wetlands III. Components of a constructed wetland

  Determine speed of sliding on smooth plane just after impact

If they are sliding on a smooth horizontal plane with the velocities shown, determine their speeds just after impact. The coefficient of restitution between them is e = 0.6. Disks A and B have a mass of 16kg and 11kg , respectively.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd